Message type: E = Error
Message class: PJ - MPX interface messages (Download and Upload)
Message number: 750
Message text: W: Resources not entered could be referenced: BDC may stop
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PJ750
- W: Resources not entered could be referenced: BDC may stop ?The SAP error message PJ750 W indicates that there are resources that have not been entered for a project or activity, which could lead to issues during the execution of a batch data communication (BDC) session. This warning suggests that the BDC process may stop or encounter problems due to the missing resource assignments.
Cause: Missing Resource Assignments: The primary cause of this error is that the project or activity does not have any resources assigned to it. Resources can include personnel, equipment, or materials that are necessary for the project. Incorrect Data Entry: There may be an issue with the data being uploaded or processed in the BDC session, such as missing fields or incorrect formatting. Project Structure Issues: The project structure may not be properly defined, leading to missing links between activities and resources.
Solution: Check Resource Assignments: Go to the project or activity in question and verify that all necessary resources are assigned. This
Get instant SAP help. Sign up for our Free Essentials Plan.
PJ740
W: Objects not entered could be referenced: BDC may stop
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PJ730
Resource assignments to group of activities & not supported
What causes this issue? You have assigned resources to collective activities in Microsoft Project (R). The SAP Project System does not recognize coll...
PJ760
Correct the time (format): &
What causes this issue? The PC file has the time in a format that cannot be read during the upload transaction.System Response INCLUDE 'NA_ALLG...
PJ770
Correct the date (format): &
What causes this issue? The PC file has the date in a format that cannot be read by the upload transaction.System Response INCLUDE 'NA_ALLG_NOF...
Click on this link to search all SAP messages.