How To Fix PJ750 - W: Resources not entered could be referenced: BDC may stop


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PJ - MPX interface messages (Download and Upload)

  • Message number: 750

  • Message text: W: Resources not entered could be referenced: BDC may stop

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PJ750 - W: Resources not entered could be referenced: BDC may stop ?

    The SAP error message PJ750 W indicates that there are resources that have not been entered for a project or activity, which could lead to issues during the execution of a batch data communication (BDC) session. This warning suggests that the BDC process may stop or encounter problems due to the missing resource assignments.

    Cause:

    1. Missing Resource Assignments: The primary cause of this error is that the project or activity does not have any resources assigned to it. Resources can include personnel, equipment, or materials that are necessary for the project.
    2. Incorrect Data Entry: There may be an issue with the data being uploaded or processed in the BDC session, such as missing fields or incorrect formatting.
    3. Project Structure Issues: The project structure may not be properly defined, leading to missing links between activities and resources.

    Solution:

    1. Check Resource Assignments:

      • Go to the project or activity in question and verify that all necessary resources are assigned. This can be done in the Project System (PS) module by navigating to the relevant project and checking the resource assignments.
      • If resources are missing, add them as needed.
    2. Review BDC Data:

      • If you are using a BDC session to upload data, review the data being uploaded to ensure that all required fields are filled out correctly, including resource assignments.
      • Make sure that the data format matches the expected format in SAP.
    3. Validate Project Structure:

      • Ensure that the project structure is correctly defined and that all activities are linked to the appropriate resources.
      • Check for any inconsistencies in the project hierarchy that may lead to missing resource references.
    4. Testing:

      • After making the necessary adjustments, test the BDC process again to see if the error persists. If it does, further investigation may be needed to identify any other underlying issues.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP for managing projects and resources, such as:
      • CJ20N: Project Builder
      • CJ02: Change Project
      • CJ03: Display Project
      • CJR2: Change Project Planning
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message. SAP Notes can provide additional context or solutions for specific scenarios.
    • Documentation: Review SAP documentation related to Project System (PS) and resource management for best practices and guidelines on managing resources effectively.

    By addressing the missing resource assignments and ensuring that the data being processed is complete and accurate, you should be able to resolve the PJ750 W error and proceed with your BDC session without issues.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant