Message type: E = Error
Message class: PJ - MPX interface messages (Download and Upload)
Message number: 710
Message text: Control key & not valid (Please check)
The MPX file contains a control key that is not defined in the SAP
System.
The control key will be ignored during upload.
Error message extract from SAP system. Copyright SAP SE.
PJ710
- Control key & not valid (Please check) ?The SAP error message PJ710, which states "Control key & not valid (Please check)," typically occurs in the context of project management or project system (PS) modules when a user attempts to create or modify a project-related object (like a network, activity, or WBS element) using an invalid control key.
Cause: Invalid Control Key: The control key specified does not exist in the system or is not defined for the type of operation you are trying to perform.
Configuration Issues: The control key may not be properly configured in the system, or it may not be assigned to the relevant project type or activity type. Authorization Issues: The user may not have the necessary authorizations to use the specified control key. Data Entry Error: There may be a typographical error in the control key entered.
Solution: Check Control Key: Verify that the control key you are using is valid. You can do this by navigating to the
Get instant SAP help. Sign up for our Free Essentials Plan.
PJ700
PC file not found
What causes this issue? The PC file that you maintained for the upload was not found.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJE...
PJ690
Duration "&" is not in a valid MPX unit (Please correct)
What causes this issue? The unit for time has an invalid MPX format.System Response The system issues an error message and will not allow you to con...
PJ720
Milestone indicator & not valid (Please check)
What causes this issue? The MPX file contains a milestone that is not defined in the SAP System.System Response The milestone indicator will be igno...
PJ730
Resource assignments to group of activities & not supported
What causes this issue? You have assigned resources to collective activities in Microsoft Project (R). The SAP Project System does not recognize coll...