Do you have any question about this error?
Message type: E = Error
Message class: /PF1/MSG_LOG_GUI -
Message number: 119
Message text: Calculation of the planned processing date has failed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PF1/MSG_LOG_GUI119
- Calculation of the planned processing date has failed ?The SAP error message
/PF1/MSG_LOG_GUI119
indicating that "Calculation of the planned processing date has failed" typically arises in the context of scheduling or planning activities within SAP, particularly in modules like Production Planning (PP) or Project System (PS). This error can occur due to various reasons, and understanding the cause is crucial for finding a solution.Possible Causes:
Missing or Incorrect Data: The planned processing date calculation may fail due to missing or incorrect data in the master data (e.g., material master, routing, work center) or transaction data (e.g., production order, project definition).
Scheduling Parameters: Incorrect scheduling parameters or settings in the configuration can lead to issues in calculating the planned dates.
Capacity Constraints: If there are capacity constraints in the work centers or resources, the system may not be able to calculate a feasible planned date.
Calendar Issues: If the factory calendar or work schedule is not set up correctly, it can affect the calculation of planned dates.
System Bugs or Limitations: Occasionally, there may be bugs or limitations in the SAP version being used that can lead to this error.
Solutions:
Check Master Data: Verify that all relevant master data (material, routing, work center) is complete and accurate. Ensure that all necessary fields are filled out correctly.
Review Scheduling Parameters: Check the scheduling parameters in the configuration settings. Ensure that they are set up correctly for the specific planning scenario you are working with.
Analyze Capacity: Review the capacity of work centers and resources. Ensure that there are no capacity overloads or constraints that could prevent the calculation of planned dates.
Inspect Factory Calendar: Ensure that the factory calendar and work schedules are correctly defined and that there are no discrepancies that could affect date calculations.
Check for Notes and Patches: Look for SAP Notes or patches that may address known issues related to this error message. Sometimes, applying the latest updates can resolve unexpected behavior.
Debugging: If you have access to technical resources, consider debugging the process to identify where the calculation is failing. This may require the assistance of an ABAP developer.
Consult Documentation: Review SAP documentation or help resources for any specific guidance related to the error message and the context in which it occurs.
Related Information:
CO01
(Create Production Order), CJ20N
(Project Builder), or others depending on the context of the error.By systematically checking these areas, you should be able to identify the cause of the error and implement an appropriate solution.
Get instant SAP help. Start your 7-day free trial now.
/PF1/MSG_LOG_GUI118
Latest feedback date calculated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PF1/MSG_LOG_GUI117
Result of CHECK_TRANSITION overwritten by customer implementation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PF1/MSG_LOG_GUI120
Planned processing date calculated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PF1/MSG_LOG_GUI121
Posting date calculation failed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.