How To Fix PEP231 - Nodes with NODE_ID &1 and &2 both occur at end of task group sequence


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PEP - Schedule Manager: Messages

  • Message number: 231

  • Message text: Nodes with NODE_ID &1 and &2 both occur at end of task group sequence

  • Show details Hide details
  • What causes this issue?

    One of the task groups has more than one final task. This is not
    possible.
    Technical information: All tasks with the same task group are connected
    to one another in a chain. The content of the
    NSIBLING_ID field refers to the
    NODE_ID node of the next task in the chain.
    Since this chain can logically only end with
    one task, it follows that only one task in a task group (the task at the
    end of the chain) can have an empty NSIBLING_ID field. If there is more
    than one field with an empty NSIBLING_ID field, the task list is faulty.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PEP231 - Nodes with NODE_ID &1 and &2 both occur at end of task group sequence ?
    The SAP error message PEP231 indicates that there is an issue with the task group sequence in the Project Management (PS) module, specifically related to the nodes defined in a task group. The error message states that two nodes with the specified NODE_IDs both occur at the end of the task group sequence, which is not allowed.
    
    Cause: This error typically arises when: Duplicate End Nodes: Two nodes are defined as end nodes in the task group sequence, which violates the expected structure of a task group. In a valid sequence, there should only be one end node. Incorrect Task Group Configuration: The configuration of the task group may not be set up correctly, leading to multiple nodes being treated as end nodes. Data Integrity Issues: There may be inconsistencies or errors in the underlying data that define the task group and its nodes.
    Solution: To resolve the PEP231 error, you can take the following steps: Review Task

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker