Do you have any question about this error?
Message type: E = Error
Message class: PEP - Schedule Manager: Messages
Message number: 096
Message text: No inconsistencies were found.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PEP096
- No inconsistencies were found. ?The SAP error message PEP096 ("No inconsistencies were found") typically occurs in the context of the Project System (PS) module when you are trying to check for inconsistencies in a project or a project element. This message indicates that the system has completed a consistency check and found no issues. However, it can sometimes be confusing if you were expecting to find inconsistencies or if you are troubleshooting a different issue.
Cause:
- Expectation of Errors: Users may expect to see inconsistencies due to prior issues or warnings but receive this message instead.
- Correct Data: The data in the project or project element is correctly maintained, and there are no inconsistencies.
- Check Process: The inconsistency check process was executed correctly, and the system confirmed that everything is in order.
Solution:
- Verify Data: If you were expecting inconsistencies, double-check the data entries in the project. Ensure that all relevant fields are filled out correctly and that there are no missing or incorrect entries.
- Review Logs: Check any logs or previous messages that might indicate what issues you were expecting. This can help clarify if there are other underlying problems.
- Re-run Checks: If you suspect that the check did not run properly, you can try re-running the consistency check to confirm the results.
- Consult Documentation: Review SAP documentation or help resources for additional context on the specific project or element you are working with.
- Seek Support: If you continue to have concerns or if there are other issues in the project, consider reaching out to your SAP support team or consulting with an SAP expert.
Related Information:
In summary, the message "No inconsistencies were found" is generally a positive indication that your project data is consistent. If you are facing issues, it may be necessary to investigate further into the specific project details or consult with SAP resources.
Get instant SAP help. Start your 7-day free trial now.
PEP095
No data found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PEP094
Variant &2 for report &1 does not exist in your logon client &3
What causes this issue? Because the variant does not exist in the client you are logged on in, the process definition cannot run in this client. Howe...
PEP097
Report & does not exist (flow definition &).
What causes this issue? A report was called in the specified flow definition. However this report no longer exists.System Response The system issues...
PEP098
For report &1, the variant &2 does not exist (flow definition &3)
What causes this issue? The variant of a report was used in the specified flow definition. However this variant no longer exists.System Response The...
Click on this link to search all SAP messages.