Message type: E = Error
Message class: PE - Shift Planning: Messages
Message number: 599
Message text: End date is not within planning period
You have entered an end date that does not fall within the selection
period for Shift Planning. This is not possible.
The system rejects the entry.
Please enter an end date that lies within the Shift Planning selection
period.
Error message extract from SAP system. Copyright SAP SE.
PE599
- End date is not within planning period ?The SAP error message PE599, which states "End date is not within planning period," typically occurs in the context of project management or planning scenarios within SAP. This error indicates that the end date specified for a task, project, or planning element falls outside the defined planning period.
Cause:
- Incorrect Date Entry: The end date entered for a project or task is beyond the limits of the planning period set in the system.
- Planning Period Configuration: The planning period may not be correctly configured in the system, leading to discrepancies between the defined period and the dates being used.
- Project Settings: The project or task settings may not align with the overall planning framework, causing the end date to be invalid.
Solution:
Check the Planning Period:
- Navigate to the planning settings in your SAP system and verify the defined planning period. Ensure that the end date you are trying to enter falls within this range.
Adjust the End Date:
- If the end date is indeed outside the planning period, modify it to a date that is within the defined planning period.
Review Project Settings:
- Check the project or task settings to ensure they are correctly aligned with the overall planning framework. This may involve reviewing the project definition and any related parameters.
Consult with Configuration Team:
- If you believe the planning period should be adjusted, consult with your SAP configuration team to see if the planning period can be extended or modified to accommodate the required dates.
Use Transaction Codes:
- Use relevant transaction codes (like CJ20N for project management) to review and adjust project details.
Related Information:
By following these steps, you should be able to resolve the PE599 error and ensure that your project or task dates align with the planning period defined in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
PE598
Start date is not within planning period
What causes this issue? You have entered a start date that does not fall within the selection period for shift planning. This is not allowed.System R...
PE597
Employee cannot be assigned to his/her own &
What causes this issue? You are attempting to temporarily assign an employee to another &V1&. The assignment must be to a different &V1&a...
PE600
No suitable entries found for search term
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PE601
&1 &2 is not a valid requirement
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.