Do you have any question about this error?
Message type: E = Error
Message class: PE - Shift Planning: Messages
Message number: 598
Message text: Start date is not within planning period
You have entered a start date that does not fall within the selection
period for shift planning. This is not allowed.
The system rejects the entry.
Enter a start date within the selection period for shift planning.
Error message extract from SAP system. Copyright SAP SE.
PE598
- Start date is not within planning period ?The SAP error message PE598, which states "Start date is not within planning period," typically occurs in the context of project planning or scheduling within SAP Project System (PS) or similar modules. This error indicates that the start date you are trying to set for a project, task, or activity falls outside the defined planning period.
Cause:
- Planning Period Configuration: The planning period may not include the date you are trying to set. This can happen if the planning period is defined with specific start and end dates that do not encompass the date you are entering.
- Project Settings: The project or activity may have specific settings that restrict the dates to a certain range.
- Calendar Settings: The calendar settings for the project or the overall system may not align with the date you are trying to use.
- Data Entry Error: There may be a simple mistake in the date entry, such as entering the wrong year or month.
Solution:
Check Planning Period: Review the planning period settings in the project or activity. Ensure that the start date you are trying to enter falls within the defined planning period.
- Navigate to the project or activity in SAP and check the planning period settings.
- Adjust the planning period if necessary to include the desired start date.
Adjust Project Settings: If the project settings restrict the date range, you may need to modify these settings to allow for the desired start date.
Review Calendar Settings: Ensure that the calendar settings for the project are correctly configured. This includes checking the fiscal year variant and any specific project calendars that may be in use.
Correct Data Entry: Double-check the date you are entering for any typographical errors. Ensure that the date format is correct and that you are not inadvertently entering a date outside the intended range.
Consult Documentation: If you are unsure about how to change the planning period or project settings, refer to the SAP documentation or consult with your SAP administrator for guidance.
Related Information:
CJ20N
(Project Builder) or CJ02
(Change Project) to access and modify project settings.By following these steps, you should be able to resolve the PE598 error and successfully set the desired start date within the planning period.
Get instant SAP help. Start your 7-day free trial now.
PE597
Employee cannot be assigned to his/her own &
What causes this issue? You are attempting to temporarily assign an employee to another &V1&. The assignment must be to a different &V1&a...
PE596
Employee & is not temporarily assigned
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PE599
End date is not within planning period
What causes this issue? You have entered an end date that does not fall within the selection period for Shift Planning. This is not possible.System R...
PE600
No suitable entries found for search term
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.