How To Fix PE576 - Target plan completed from &1 to &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PE - Shift Planning: Messages

  • Message number: 576

  • Message text: Target plan completed from &1 to &2

  • Show details Hide details
  • What causes this issue?

    The target plan is not complete for the entire period, only from
    &V1& to &V2&.

    System Response

    It is not possible to carry out the planning for the requested period.

    How to fix this error?

    Please choose another period.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PE576 - Target plan completed from &1 to &2 ?

    The SAP error message PE576 "Target plan completed from &1 to &2" typically occurs in the context of production planning and control, particularly when dealing with capacity planning or scheduling in SAP. This message indicates that a target plan has been completed for a specific time period, which is defined by the parameters &1 (start date/time) and &2 (end date/time).

    Cause:

    1. Completion of Planning Period: The error usually arises when a planning period has been completed, and no further changes can be made to that period.
    2. Locked Planning Data: The planning data for the specified period may be locked, preventing any modifications.
    3. Incorrect Configuration: There may be configuration issues in the planning settings that lead to this message being triggered.

    Solution:

    1. Check Planning Period: Verify if the planning period you are trying to modify is indeed completed. If it is, you may need to adjust your planning to a different period.
    2. Unlock Data: If the planning data is locked, you may need to unlock it. This can typically be done by a user with the appropriate authorizations.
    3. Review Configuration: Check the configuration settings in the SAP system related to planning and scheduling. Ensure that they are set up correctly to allow for the desired modifications.
    4. Use Transaction Codes: Utilize relevant transaction codes (like C223 for capacity planning) to review and adjust the planning data as necessary.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling this error in your version of SAP.

    Related Information:

    • Transaction Codes: Familiarize yourself with transaction codes related to production planning, such as MD01 (MD Planning), C223 (Capacity Planning), and others that may be relevant to your planning activities.
    • User Authorizations: Ensure that you have the necessary authorizations to make changes to planning data.
    • SAP Notes: Check for any SAP Notes related to this error message for additional insights or patches that may resolve the issue.
    • Support: If the issue persists, consider reaching out to your SAP support team or consulting with SAP experts for further assistance.

    By following these steps, you should be able to address the PE576 error message effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker