Do you have any question about this error?
Message type: E = Error
Message class: PE - Shift Planning: Messages
Message number: 576
Message text: Target plan completed from &1 to &2
The target plan is not complete for the entire period, only from
&V1& to &V2&.
It is not possible to carry out the planning for the requested period.
Please choose another period.
Error message extract from SAP system. Copyright SAP SE.
PE576
- Target plan completed from &1 to &2 ?The SAP error message PE576 "Target plan completed from &1 to &2" typically occurs in the context of production planning and control, particularly when dealing with capacity planning or scheduling in SAP. This message indicates that a target plan has been completed for a specific time period, which is defined by the parameters &1 (start date/time) and &2 (end date/time).
Cause:
- Completion of Planning Period: The error usually arises when a planning period has been completed, and no further changes can be made to that period.
- Locked Planning Data: The planning data for the specified period may be locked, preventing any modifications.
- Incorrect Configuration: There may be configuration issues in the planning settings that lead to this message being triggered.
Solution:
- Check Planning Period: Verify if the planning period you are trying to modify is indeed completed. If it is, you may need to adjust your planning to a different period.
- Unlock Data: If the planning data is locked, you may need to unlock it. This can typically be done by a user with the appropriate authorizations.
- Review Configuration: Check the configuration settings in the SAP system related to planning and scheduling. Ensure that they are set up correctly to allow for the desired modifications.
- Use Transaction Codes: Utilize relevant transaction codes (like C223 for capacity planning) to review and adjust the planning data as necessary.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling this error in your version of SAP.
Related Information:
By following these steps, you should be able to address the PE576 error message effectively.
Get instant SAP help. Start your 7-day free trial now.
PE575
No persons found for organizational unit &
What causes this issue? You are using organizational unit &V1& for Shift Planning. No persons could be found for this organizational unit.Sys...
PE574
No requirements types found for shift group &
What causes this issue? You want to maintain requirements for the shift group &V1&System Response It is not possible to edit requirements si...
PE577
Shift groups &1 and &2 differ
What causes this issue? You have set up Shift Planning to select employees from all organizational units beneath and linked to the organizational uni...
PE578
Shift group not unique
What causes this issue? The shift group assignment is ambiguous in the period specified. Either the shift group is not assigned to the organizational...
Click on this link to search all SAP messages.