Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix PE504 - Factory calendar & is not valid or not activated


PE504 - Overview

  • Message type: E = Error

  • Message class: PE - Shift Planning: Messages

  • Message number: 504

  • Message text: Factory calendar & is not valid or not activated

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PE504 - Details

  • The SAP error message PE504 indicates that the factory calendar specified in your configuration is either not valid or not activated. This error typically arises in scenarios where the system is trying to perform operations that depend on the factory calendar, such as scheduling, production planning, or time management.
    
    Cause: Invalid Factory Calendar: The factory calendar specified in the configuration does not exist in the system or has been deleted. Inactive Factory Calendar: The factory calendar exists but is not activated. This can happen if the calendar has been created but not yet set to active status. Incorrect Configuration: The factory calendar may not be correctly assigned to the relevant organizational units (e.g., plant, company code). Authorization Issues: The user may not have the necessary authorizations to access or use the specified factory calendar.
    Solution: Check Factory Calendar: Go to the transaction code SCAL (Maintain Factory Calendar) and verify if the factory calendar exists. Ensure that the calendar is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PE504 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker