Message type: E = Error
Message class: PE - Shift Planning: Messages
Message number: 504
Message text: Factory calendar & is not valid or not activated
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PE504
- Factory calendar & is not valid or not activated ?The SAP error message PE504 indicates that the factory calendar specified in your configuration is either not valid or not activated. This error typically arises in scenarios where the system is trying to perform operations that depend on the factory calendar, such as scheduling, production planning, or time management.
Cause: Invalid Factory Calendar: The factory calendar specified in the configuration does not exist in the system or has been deleted. Inactive Factory Calendar: The factory calendar exists but is not activated. This can happen if the calendar has been created but not yet set to active status. Incorrect Configuration: The factory calendar may not be correctly assigned to the relevant organizational units (e.g., plant, company code). Authorization Issues: The user may not have the necessary authorizations to access or use the specified factory calendar.
Solution: Check Factory Calendar: Go to the transaction code SCAL (Maintain Factory Calendar) and verify if the factory calendar exists. Ensure that the calendar is
Get instant SAP help. Sign up for our Free Essentials Plan.
PE503
No factory calendar set for organizational unit &1 &2
What causes this issue? The organizational unit specified has no assignment to a factory calendar.System Response The system cannot proceed.How to f...
PE502
Organizational unit &1 &2 is locked
What causes this issue? The organizational unit selected for Shift Planning is locked. This situation occurs when: Data or master data for this organ...
PE505
Job &1 does not exist for period &2 to &3
What causes this issue? You have selected a job that does not exist in the period entered. Reasons for this could be: Job is not yet defined for this...
PE506
Enter a shift abbreviation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.