How To Fix PAK639 - Calculation of usage structure is not yet completed


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PAK - Package API / Package Tools

  • Message number: 639

  • Message text: Calculation of usage structure is not yet completed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PAK639 - Calculation of usage structure is not yet completed ?

    The SAP error message PAK639, which states "Calculation of usage structure is not yet completed," typically occurs in the context of SAP's Production Planning (PP) or Advanced Planning and Optimization (APO) modules. This error indicates that the system is trying to access or utilize a usage structure that has not yet been fully calculated or processed.

    Causes:

    1. Incomplete Calculation: The usage structure for a particular planning object (like a product or a production order) has not been fully calculated. This can happen if the calculation process was interrupted or if it is still running.
    2. Background Job Issues: If the calculation is supposed to be done in the background, there may be issues with the background job that is responsible for this calculation.
    3. Data Locking: There may be data locking issues where another process is currently using the data, preventing the calculation from completing.
    4. Configuration Issues: Incorrect configuration settings in the planning area or usage structure settings can lead to this error.

    Solutions:

    1. Check Calculation Status: Verify if the calculation for the usage structure is still in progress. You can do this by checking the relevant transaction codes (like /SAPAPO/MC62 for APO) to see if the calculation is still running.
    2. Re-run Calculation: If the calculation has failed or was interrupted, you may need to re-run the calculation manually. This can often be done through the relevant transaction or program.
    3. Check Background Jobs: Use transaction code SM37 to check the status of background jobs. Look for any jobs related to the calculation of the usage structure and see if they have completed successfully.
    4. Data Locking: If data locking is the issue, you may need to wait for the other process to complete or resolve any locking issues.
    5. Review Configuration: Check the configuration settings for the planning area and usage structure to ensure they are set up correctly. This may involve consulting with your SAP Basis or configuration team.
    6. Consult SAP Notes: Look for any relevant SAP Notes that may address this specific error. SAP frequently updates its knowledge base with solutions for known issues.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as MC62, SM37, and others that may help in monitoring and managing the calculation processes.
    • SAP Documentation: Review SAP documentation related to the specific module you are working with (PP, APO, etc.) for more detailed guidance on usage structures and calculations.
    • Support: If the issue persists, consider reaching out to SAP support or your internal SAP support team for further assistance.

    By following these steps, you should be able to diagnose and resolve the PAK639 error effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker