How To Fix PAB039 - Replenishment strategy &1 does not exist in this control cycle


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PAB - JIT calls

  • Message number: 039

  • Message text: Replenishment strategy &1 does not exist in this control cycle

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PAB039 - Replenishment strategy &1 does not exist in this control cycle ?

    The SAP error message PAB039 indicates that a specified replenishment strategy does not exist in the control cycle you are working with. This error typically arises in the context of SAP's Advanced Planning and Optimization (APO) or in the Production Planning (PP) module, particularly when dealing with planning strategies for materials.

    Cause:

    1. Missing Configuration: The replenishment strategy you are trying to use has not been defined or configured in the system for the specific control cycle.
    2. Incorrect Control Cycle: The control cycle you are working with may not be set up to use the specified replenishment strategy.
    3. Data Entry Error: There may be a typographical error in the replenishment strategy code you are entering.
    4. Master Data Issues: The material master or other related master data may not be correctly set up to include the replenishment strategy.

    Solution:

    1. Check Configuration:

      • Go to the configuration settings for the control cycle in SAP and verify that the replenishment strategy is defined.
      • Use transaction codes like SPRO to navigate to the relevant configuration settings.
    2. Define Replenishment Strategy:

      • If the replenishment strategy does not exist, you will need to create it. This can typically be done in the configuration settings under the relevant planning area.
      • Ensure that the strategy is correctly assigned to the control cycle.
    3. Verify Control Cycle:

      • Check the control cycle settings to ensure that it is correctly set up to use the replenishment strategy you are trying to apply.
      • You can use transaction codes like APO-PP/DS to view and edit control cycles.
    4. Check Master Data:

      • Ensure that the material master data is correctly set up and that the replenishment strategy is assigned to the relevant materials.
      • Use transaction codes like MM03 to view material master data.
    5. Consult Documentation:

      • Review SAP documentation or help files related to control cycles and replenishment strategies for additional guidance.
    6. Contact Support:

      • If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert who can provide further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as SPRO, MM03, and APO-PP/DS.
    • SAP Notes: Check for any SAP Notes related to this error message for potential patches or updates that may address the issue.
    • Training and Documentation: Consider reviewing training materials or documentation on SAP APO and PP to better understand how replenishment strategies and control cycles work.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author