Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix PAB036 - Sched.agrmnt &1 &2 differs from sched. agreemt &3 &4 from sched. JIT call


PAB036 - Overview

  • Message type: E = Error

  • Message class: PAB - JIT calls

  • Message number: 036

  • Message text: Sched.agrmnt &1 &2 differs from sched. agreemt &3 &4 from sched. JIT call

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PAB036 - Details

  • The SAP error message PAB036 indicates a discrepancy between a scheduling agreement and a Just-In-Time (JIT) call. This error typically arises in scenarios where the details of the scheduling agreement do not match the details of the JIT call, which can lead to issues in material planning and delivery.
    
    Cause: The error message PAB036 can be triggered by several factors, including: Mismatch in Agreement Details: The scheduling agreement (sched. agrmnt) and the JIT call may have different quantities, delivery dates, or other key parameters. Incorrect Configuration: There may be configuration issues in the JIT call setup or the scheduling agreement. Data Entry Errors: Manual entry errors when creating or modifying the scheduling agreement or JIT call can lead to discrepancies. Versioning Issues: If there are multiple versions of the scheduling agreement, the system may be referencing an outdated version.
    Solution: To resolve the PAB036 error, you can take the following steps: Check the Scheduling Agreement: Review the details of

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PAB036 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant