Message type: E = Error
Message class: PAB - JIT calls
Message number: 021
Message text: Time def. &1 for sum. JIT call &2 does not allow this delivery time
You have entered a delivery time that is not within the present period
of the existing summarized JIT call. This is not permissible.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
When changing the delivery time, make sure that it is within the period
of the time definition. The upper and lower limits of this period are
stated in the MRP planning calendar (grouping using exact days) or in
the factory calendar (grouping using exact times).
Error message extract from SAP system. Copyright SAP SE.
PAB021
- Time def. &1 for sum. JIT call &2 does not allow this delivery time ?The SAP error message PAB021 indicates that there is an issue with the delivery time defined for a specific Just-In-Time (JIT) call in the system. This error typically arises when the delivery time specified in the JIT call does not align with the time definition set for the relevant production or delivery process.
Cause: Inconsistent Time Definitions: The delivery time for the JIT call does not match the time definitions configured in the system. This could be due to incorrect settings in the JIT call or the time definition itself.
Configuration Issues: There may be a misconfiguration in the JIT settings or the related master data (like material master, vendor master, etc.). Time Overlap: The delivery time specified may overlap with other scheduled deliveries or production processes, leading to conflicts.
Solution: Check JIT Call Settings: Review the JIT call settings to ensure that the delivery time is correctly defined. Make sure it aligns with the expected
Get instant SAP help. Sign up for our Free Essentials Plan.
PAB020
All items in summarized JIT call & have already been posted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PAB019
Not possible to post GR for items already posted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PAB022
The delivery time is in the past
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PAB023
Partner role &1 not found in scheduling agreement &2
What causes this issue? No partner has been found in the scheduling agreement for the partner function, as defined in the JIT call profile.System Res...
Click on this link to search all SAP messages.