Do you have any question about this error?
Message type: E = Error
Message class: PAB - JIT calls
Message number: 013
Message text: Please enter either shift sequence or PPC planning calendar
You have entered both a shift sequence (for grouping using exact times)
as well as a planning calendar (for grouping using exact days)
It is not possible to maintain both types of grouping at the same
time.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Decide on one form of grouping.
Error message extract from SAP system. Copyright SAP SE.
PAB013
- Please enter either shift sequence or PPC planning calendar ?The SAP error message PAB013 indicates that the system requires either a shift sequence or a PPC (Production Planning and Control) planning calendar to be specified in order to proceed with the operation you are attempting. This error typically occurs in the context of production planning or scheduling within SAP.
Cause:
- Missing Shift Sequence: The shift sequence defines the working hours and shifts for production resources. If this is not defined for the relevant work center or production order, the system cannot determine when production can occur.
- Missing PPC Planning Calendar: The PPC planning calendar is used to define the working days and non-working days for production planning. If this is not set up, the system cannot schedule production activities correctly.
Solution:
To resolve the PAB013 error, you can take the following steps:
Check Work Center Settings:
- Go to the work center configuration in SAP (Transaction code: CR01 or CR02).
- Ensure that a shift sequence is assigned to the work center. If not, you will need to create or assign a shift sequence.
Define Shift Sequence:
- If a shift sequence is not defined, you can create one using Transaction code: OOSB (Shift Sequence).
- Define the shifts, including start and end times, and assign it to the relevant work center.
Check PPC Planning Calendar:
- Ensure that a PPC planning calendar is assigned to the relevant work center or production order.
- You can check this in the work center settings or in the production order details.
Assign PPC Planning Calendar:
- If a PPC planning calendar is not defined, you can create one using Transaction code: OOVB (Planning Calendar).
- Define the working days and assign it to the relevant work center.
Recheck Production Order:
- After making the necessary adjustments, go back to the production order or planning transaction that triggered the error and try again.
Related Information:
By following these steps, you should be able to resolve the PAB013 error and continue with your production planning activities in SAP.
Get instant SAP help. Start your 7-day free trial now.
PAB012
Flag & is not designed for "Display or change summarized JIT call"
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PAB011
Cannot determine an ISO code in item &1 for unit of measure &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PAB014
Entered start delivery date must be before end delivery date
What causes this issue? System Response The system issues an error message and will not allow you to continue with this transaction until the error i...
PAB015
Maintain table & for entry &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.