How To Fix P2708 - There is a cost assignment specification


P2708 - Overview

  • Message type: E = Error

  • Message class: P2 - Messages for HR Time Management

  • Message number: 708

  • Message text: There is a cost assignment specification

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message P2708 - There is a cost assignment specification ?
    The SAP error message P2708, which states "There is a cost assignment specification," typically occurs in the context of cost accounting or when dealing with internal orders, cost centers, or projects. This error indicates that there is a requirement for a cost assignment specification that has not been fulfilled.
    
    Cause: The error can arise due to several reasons, including: Missing Cost Assignment: The system expects a cost assignment (like a cost center, internal order, or project) to be specified for the transaction, but it is missing. Incorrect Configuration: The configuration settings for cost assignment in the relevant module may not be set up correctly. Data Entry Issues: There may be issues with the data entered in the transaction, such as incorrect or incomplete information. Authorization Issues: The user may not have the necessary authorizations to perform the transaction involving cost assignments.
    Solution: To resolve the P2708 error, you can take the following steps: Check Cost Assignment: Ensure that a

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant