Do you have any question about this error?
Message type: E = Error
Message class: P/ -
Message number: 087
Message text: The operations are not assigned to a workcenter.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
P/087
- The operations are not assigned to a workcenter. ?The SAP error message P/087, which states "The operations are not assigned to a work center," typically occurs in the context of production planning and control, particularly when dealing with routing and work centers in the SAP system. This error indicates that the operations defined in a routing are not linked to any work center, which is necessary for the system to schedule and execute production orders.
Causes:
- Missing Work Center Assignment: The operations in the routing do not have a work center assigned to them.
- Incorrect Routing Configuration: The routing may not be properly configured, leading to operations being unassigned.
- Deleted or Inactive Work Center: The work center that was previously assigned may have been deleted or marked as inactive.
- Data Entry Errors: There may have been mistakes during the creation or modification of the routing or work center.
Solutions:
Check Routing Configuration:
- Go to the routing transaction (e.g., CA03) and check the operations to ensure that each operation has a valid work center assigned.
- If any operations are missing a work center, assign the appropriate work center.
Verify Work Center Status:
- Use transaction code CR01 or CR02 to check the status of the work center. Ensure that it is active and correctly configured.
- If the work center is inactive, you may need to reactivate it or create a new work center.
Review Production Order:
- If the error occurs while processing a production order, check the order details to ensure that the routing and work center are correctly linked.
Recreate Routing:
- If the routing is significantly misconfigured, consider recreating it from scratch, ensuring that all operations are correctly assigned to valid work centers.
Consult Documentation:
- Review SAP documentation or help resources for additional guidance on routing and work center assignments.
Related Information:
Transaction Codes:
SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
User Roles and Authorizations: Ensure that the user has the necessary permissions to view and modify routings and work centers.
By following these steps, you should be able to resolve the P/087 error and ensure that your operations are correctly assigned to work centers in SAP.
Get instant SAP help. Start your 7-day free trial now.
P/086
Please enter a valid standard value key.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
P/081
There is no material assigned to group &.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
P/088
None of the planning periods required by you could be created
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
P/113
Error while writing new planning period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.