How To Fix OZ129 - Activity is not included in project &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: OZ - Customizing Basis tools

  • Message number: 129

  • Message text: Activity is not included in project &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OZ129 - Activity is not included in project &1 ?

    The SAP error message OZ129, which states "Activity is not included in project &1," typically occurs in the context of project management within SAP, particularly when dealing with project definitions and activities in the Project System (PS) module. This error indicates that the specific activity you are trying to access or manipulate is not part of the specified project.

    Causes:

    1. Activity Not Assigned: The activity you are trying to work with has not been assigned to the project in question.
    2. Incorrect Project Number: The project number (&1) you are referencing may be incorrect or does not exist.
    3. Project Status: The project may be in a status that does not allow for changes or additions to activities.
    4. Authorization Issues: The user may not have the necessary authorizations to view or modify the project or its activities.
    5. Data Consistency Issues: There may be inconsistencies in the project data, such as missing links between the project and its activities.

    Solutions:

    1. Check Activity Assignment: Verify that the activity you are trying to access is indeed assigned to the project. You can do this by navigating to the project structure and checking the list of activities.
    2. Verify Project Number: Ensure that you are using the correct project number. Double-check for any typographical errors.
    3. Review Project Status: Check the status of the project to ensure it is in a state that allows for modifications. If the project is closed or locked, you may need to unlock it or change its status.
    4. Authorization Check: Ensure that you have the necessary authorizations to access and modify the project and its activities. You may need to contact your SAP security administrator for assistance.
    5. Data Consistency Check: Run consistency checks in the Project System to identify and resolve any data inconsistencies. This may involve using transaction codes like CJ20N or CJ02 to review and correct project data.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ02 (Change Project), and CJ03 (Display Project) to manage project activities.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message. SAP Notes can provide additional context or solutions for specific scenarios.
    • Documentation: Review SAP documentation related to Project System (PS) for best practices on managing projects and activities.

    If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the Project System module.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author