Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix O1093 - Within call-off, valid to &, must be equal to deliv.date &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: O1 - IS-Oil : Message pool exchanges

  • Message number: 093

  • Message text: Within call-off, valid to &, must be equal to deliv.date &

  • Show details Hide details
  • What causes this issue?

    The date entered does not match the <DS:GLOS.delivery date>delivery
    date</> of the <DS:GLOS.release order>call-off</>.

    System Response

    Error

    How to fix this error?

    Enter a date in quantity schedule maintenance which corresponds to the
    delivery date in the document.
    &REFERENCE&
    <DS:NA.O1089>One delivery date</>

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message O1093 - Within call-off, valid to &, must be equal to deliv.date & ?

    The SAP error message O1093 indicates that there is a mismatch between the "valid to" date of a call-off and the delivery date specified in the system. This error typically occurs in the context of scheduling agreements or call-off orders where the delivery dates must fall within the validity period of the agreement.

    Cause:

    1. Date Mismatch: The delivery date you are trying to enter or process is outside the validity period of the call-off. The "valid to" date of the call-off must be equal to or later than the delivery date.
    2. Incorrect Configuration: There may be an issue with how the scheduling agreement or call-off is configured, leading to incorrect date settings.
    3. Data Entry Error: The user may have mistakenly entered an incorrect delivery date.

    Solution:

    1. Check Validity Dates: Review the scheduling agreement or call-off to ensure that the "valid to" date is set correctly and that it encompasses the delivery date you are trying to use.
    2. Adjust Delivery Date: If the delivery date is indeed outside the validity period, either adjust the delivery date to fall within the valid range or extend the "valid to" date of the call-off if appropriate.
    3. Review Agreement Settings: Ensure that the scheduling agreement is set up correctly, including all relevant dates and conditions.
    4. Consult Documentation: If you are unsure about the validity dates or how to adjust them, refer to your organization's SAP documentation or consult with your SAP administrator.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like ME31L (Create Scheduling Agreement), ME32L (Change Scheduling Agreement), or ME33L (Display Scheduling Agreement) to view or modify the scheduling agreement.
    • SAP Notes: Check for any relevant SAP Notes that might address specific issues related to scheduling agreements and call-offs.
    • User Roles: Ensure that you have the necessary permissions to make changes to scheduling agreements or call-offs in SAP.

    By following these steps, you should be able to resolve the O1093 error and proceed with your call-off or delivery processing.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant