Message type: E = Error
Message class: O1 - IS-Oil : Message pool exchanges
Message number: 026
Message text: First sched.date does not match fact.day "from day" &, check
"Valid from" date in quantity schedule does not match the first
schedule line in the quantity schedule.
&SYSTEM_RESPONSE& / &SYSTEM_MESSAGE&
This message is controlled by Table T160M (System Messages).
If it is defined as "W" (Warning), you get a warning message; if it is
defined as an error, you get an error message (default W). If the
message occurs while processing a contract, the system is not able to
check and update the relevant contract scheduling line with a requested
<DS:GLOS.delivery date>delivery date</> delivery date, which is before
the date of the 1st scheduling (-> see message O1094 ). Within the
call-off, the system is not able to check the goods receipt/delivery
against the call-off schedule line, the update of a
<DS:GLOS.goods receipt>GR</>/<DS:GLOS.delivery>delivery</> occurs
in the last schedule line of the related
<DS:GLOS.release order>call-off</>.
The reason that the message appears may be that after creating the
(quantity schedule), the validity period changed or a schedule line was
manually deleted.
Check the validity period in the quantity schedule.
Check the first scheduling date of the schedule lines.
If a warning appears and you insert a new scheduling period, please use
a valid function key (e.G. Select all, Deselect all...) with a POPUP,
press cancel on the popup-screen or call QS again after leaving.
Insert a new scheduling line (period) with the first
<DS:GLOS.factory_calendar>factory</> day after "valid from" date
<ZH>or</> use function "Restructure QS".
&DEPENDENCIES&
<DS:DE.OIA_ENTLU>Breakdown indicator</> and <DS:DE.VONDAT>valid from
date</>
Error message extract from SAP system. Copyright SAP SE.
O1026
- First sched.date does not match fact.day "from day" &, check ?The SAP error message O1026, which states "First sched.date does not match fact.day 'from day' &, check," typically occurs in the context of scheduling or planning within SAP, particularly in modules related to production planning or project management. This error indicates a mismatch between the scheduled date and the actual date (fact day) that is expected in the system.
Cause: Date Mismatch: The primary cause of this error is that the first scheduled date for a task or operation does not align with the actual date that the system is trying to reference. This can happen if: The scheduling parameters have been incorrectly set. There are changes in the project timeline that have not been updated in the system. The data entry for the scheduled dates is incorrect.
Configuration Issues: There may be configuration issues in the scheduling settings or in the master data that define how dates are calculated and displayed. Data Integrity Issues: If there
Get instant SAP help. Sign up for our Free Essentials Plan.
O1025
QS target qty.: & & - total referenced: & (&)
What causes this issue? Several <DS:GLOS.release order>call-off</> items with the same contract item reference. The SUM of the <DS:GLO...
O1024
Return qty. > & & of QS line & &
What causes this issue? The <DS:GLOS.returns>return</> quantity exceeds the quantity called-off in the quantity schedule. If the quantity...
O1027
Please check last sched.date & against breakdown indicator
What causes this issue? It could be that the last scheduling period does not match the <DS:DE.BISDAT>"valid-to" date</> and the...
O1028
GR qty.by & & > avail., (QS period: & &)
What causes this issue? <DS:GLOS.goods receipt>Goods receipt</> quantity exceeds the available quantity in the quantity schedule, for th...