How To Fix NJIT_O_MSG158 - Considering the break and shift sequences, the date will be adjusted


SAP Error Message - Details

  • Message type: E = Error

  • Message class: NJIT_O_MSG -

  • Message number: 158

  • Message text: Considering the break and shift sequences, the date will be adjusted

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message NJIT_O_MSG158 - Considering the break and shift sequences, the date will be adjusted ?

    The SAP error message NJIT_O_MSG158 typically relates to issues with scheduling or planning in the context of production or project management. This message indicates that the system has detected a conflict or inconsistency in the scheduling of tasks, particularly when considering break and shift sequences. The system is informing you that it will automatically adjust the dates to resolve these conflicts.

    Cause:

    1. Break and Shift Configuration: The error often arises from incorrect or conflicting configurations in the break and shift sequences defined in the system. This can happen if the defined breaks overlap with scheduled work times or if shifts are not properly aligned with the production schedule.

    2. Scheduling Conflicts: If there are tasks scheduled that cannot be executed due to the defined breaks or shifts, the system will attempt to adjust the dates to accommodate these constraints.

    3. Resource Availability: If resources (like machines or personnel) are not available during the scheduled times due to breaks or shifts, the system may need to adjust the schedule.

    Solution:

    1. Review Break and Shift Settings: Check the configuration of breaks and shifts in the system. Ensure that they are set up correctly and do not overlap with scheduled work times.

    2. Adjust Scheduling Parameters: If necessary, adjust the scheduling parameters for the tasks or production orders to ensure they align with the defined breaks and shifts.

    3. Manual Intervention: If the automatic adjustment does not meet your requirements, you may need to manually adjust the dates or reschedule tasks to ensure they fit within the available working hours.

    4. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing scheduling conflicts and understanding the implications of break and shift sequences.

    5. Testing: After making adjustments, test the scheduling to ensure that the error does not recur and that the production schedule is feasible.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance on scheduling issues.
    • User Forums: Engage with SAP user communities or forums where similar issues may have been discussed, and solutions shared.
    • Training: Consider training for users involved in scheduling and planning to better understand how to configure breaks and shifts effectively.

    By addressing the underlying causes and ensuring proper configuration, you can minimize the occurrence of this error and improve the efficiency of your scheduling processes in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant