Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix NJIT_O_MSG078 - Enter a planning horizon long enough to cover the replenishment time


NJIT_O_MSG078 - Overview

  • Message type: E = Error

  • Message class: NJIT_O_MSG -

  • Message number: 078

  • Message text: Enter a planning horizon long enough to cover the replenishment time

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


NJIT_O_MSG078 - Details

  • The SAP error message NJIT_O_MSG078 indicates that the planning horizon you have set is not sufficient to cover the replenishment time required for the materials or products you are trying to plan. This error typically occurs in the context of inventory management and production planning, particularly when using the SAP Integrated Business Planning (IBP) or Advanced Planning and Optimization (APO) modules.
    
    Cause: Insufficient Planning Horizon: The planning horizon defined in your planning settings is shorter than the replenishment lead time for the materials. This means that the system cannot plan for the time it takes to replenish stock. Replenishment Time Configuration: The replenishment lead time for the materials may be incorrectly configured or not aligned with the actual supply chain processes. Planning Parameters: The parameters set for the planning run may not be appropriate for the current supply chain dynamics.
    Solution: Extend the Planning Horizon: Go to the planning settings in your SAP system and increase the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


NJIT_O_MSG078 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker