Do you have any question about this error?
Message type: E = Error
Message class: MW - Messages IS-R / Allocation Tables
Message number: 404
Message text: Recipient determination requires a default delivery phase for plants
A distribution center is maintained for a particular period as a
plant's supplying plant. For the recipients (i.e. the plants) to be
determined that are supplied by a distribution center, a delivery phase
must be entered.
Recipient determination could not be carried out.
Please enter a delivery phase.
Error message extract from SAP system. Copyright SAP SE.
MW404
- Recipient determination requires a default delivery phase for plants ?The SAP error message MW404 ("Recipient determination requires a default delivery phase for plants") typically occurs in the context of logistics and delivery processes within the SAP system. This error indicates that the system is unable to determine a recipient for a delivery because a default delivery phase has not been defined for the specified plant.
Cause:
The primary cause of this error is that the system requires a default delivery phase to be set up for the plant involved in the transaction. The delivery phase is essential for determining how goods are processed and delivered, and without it, the system cannot proceed with the delivery process.
Solution:
To resolve the MW404 error, you need to ensure that a default delivery phase is defined for the relevant plant. Here are the steps to do this:
Access the Customizing Settings:
- Go to the SAP Easy Access screen.
- Navigate to the following path:
SPRO -> SAP Reference IMG -> Logistics Execution -> Shipping -> Deliveries -> Define Delivery Phases
.Define Default Delivery Phase:
- In the delivery phases configuration, check if a default delivery phase is assigned to the plant that is causing the error.
- If not, create a new entry or modify an existing one to assign a default delivery phase to the plant.
Assign Delivery Phase to Plant:
- Ensure that the delivery phase is correctly assigned to the plant in question. This may involve linking the delivery phase to the plant in the configuration settings.
Check for Other Configuration Issues:
- Verify that all related settings for the delivery process are correctly configured, including shipping points, transportation zones, and other relevant parameters.
Test the Configuration:
- After making the necessary changes, test the delivery process again to ensure that the error no longer occurs.
Related Information:
SPRO
for configuration, VL01N
for creating deliveries, or VL02N
for changing deliveries.If the issue persists after following these steps, it may be beneficial to consult with your SAP Basis or functional team for further investigation, as there could be additional underlying issues affecting the delivery process.
Get instant SAP help. Start your 7-day free trial now.
MW403
Invalid parameter & for switch number assignment
System Response INCLUDE ISR_VERARBEITUNGHow to fix this error? INCLUDE ISR_SYSTEMFEHLERProcedure for System Administrators When a function module /...
MW402
&1 DC recipient determination not possible: &2 is not a DC
What causes this issue? Distibution-center recipient determination has been set up in the item category of the allocation table item. Recipient deter...
MW405
Recipient determination running for today's date
What causes this issue? The receiving plants for a distribution center are determined for a particular timepoint. Normally, this is the first deliver...
MW406