Do you have any question about this error?
Message type: E = Error
Message class: MW - Messages IS-R / Allocation Tables
Message number: 378
Message text: &1. Please enter an allocation strategy and a plant group
You selected the single-step method for distributing quantities of
generic materials. This method involves the quotas being determined
from the <DS:GLOS.352A8D3BD3895CD5E10000009B38F974>quota scales</>
assigned to the <DS:GLOS.352A8D36D3895CD5E10000009B38F974>value
scales</> of the variant-creating characteristics of the generic
material.
INCLUDE ISR_VERARBEITUNG OBJECT DOKU ID TX
Please enter a plant group and the allocation strategy <zh>D</> defined
for single-step distribution.
Error message extract from SAP system. Copyright SAP SE.
MW378
- &1. Please enter an allocation strategy and a plant group ?The SAP error message MW378 indicates that there is a missing allocation strategy for a specific plant group in the system. This error typically occurs in the context of inventory management or material requirements planning (MRP) when the system is unable to determine how to allocate stock or resources due to the absence of a defined strategy.
Cause:
- Missing Allocation Strategy: The primary cause of this error is that the allocation strategy has not been defined for the specified plant group in the system.
- Configuration Issues: There may be configuration issues in the material master or in the allocation strategy settings.
- Plant Group Not Defined: The plant group you are trying to use may not be properly defined or may not exist in the system.
Solution:
To resolve the MW378 error, you can follow these steps:
Define Allocation Strategy:
- Go to the configuration settings in SAP.
- Navigate to the relevant area for defining allocation strategies (usually found under Logistics or Material Management).
- Ensure that an allocation strategy is defined for the plant group in question.
Check Plant Group Configuration:
- Verify that the plant group you are using is correctly set up in the system.
- Ensure that all necessary parameters and settings for the plant group are correctly configured.
Assign Allocation Strategy:
- If an allocation strategy exists, ensure that it is assigned to the relevant plant group.
- You may need to create a new allocation strategy if one does not exist.
Material Master Data:
- Check the material master data for the materials involved. Ensure that the allocation strategy is correctly assigned in the material master record.
Consult Documentation:
- Refer to SAP documentation or help resources for specific instructions on how to define and assign allocation strategies.
Testing:
- After making the necessary changes, test the process again to ensure that the error has been resolved.
Related Information:
OMD1
(for defining allocation strategies) or MM02
(to change material master data) to access the relevant configuration settings.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the relevant area.
Get instant SAP help. Start your 7-day free trial now.
MW377
&1. Please enter the quantity of the generic material to be allocated.
What causes this issue? You selected the two-step method for distributing quantities of a generic material. This method involves the total quantity o...
MW376
&1: no shipping data found (&2 &3, error &4)
What causes this issue? You selected an item category that requires deliveries or sales orders to be generated as the allocation table's follow-...
MW379
&1. Please enter the quantity of the generic material to be allocated.
What causes this issue? You selected the single-step method for allocating generic materials. This method involves quotas being determined from <D...
MW380
&1 is not a valid class
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.