Do you have any question about this error?
Message type: E = Error
Message class: MQ - Messages for Euro Changeover Package
Message number: 101
Message text: Currency key cannot be determined for operating concerns
The assignment of currency keys for an operating concern is not unique
in table TKEBL.
Several entries exist for an operating concern in table TKEBL (same
entry in key field ERKRS and different entry in key field PALEDGER) for
which different currency keys are specified (in field WAERS).
Correct table TKEBL. All data records for the same operating concern
(field ERKRS) must have the same currency key (entry in field WAERS).
Restart program EWUORGLA.
Error message extract from SAP system. Copyright SAP SE.
MQ101
- Currency key cannot be determined for operating concerns ?The SAP error message "MQ101 Currency key cannot be determined for operating concerns" typically occurs in the context of SAP Controlling (CO) and is related to the configuration of operating concerns in Profitability Analysis (CO-PA). This error indicates that the system is unable to determine the currency key for the specified operating concern, which is necessary for processing financial data.
Causes:
- Missing Configuration: The currency key for the operating concern may not be defined in the system. This can happen if the operating concern was not properly set up during the configuration process.
- Incorrect Master Data: The master data related to the operating concern may be incomplete or incorrect, leading to the inability to determine the currency key.
- Missing or Incorrect Currency Settings: The currency settings in the controlling area or company code may not align with the requirements of the operating concern.
- Data Transfer Issues: If data is being transferred from another system or module, there may be issues with how currency information is being passed.
Solutions:
Check Operating Concern Configuration:
- Go to the configuration settings for the operating concern in SAP (Transaction code:
OKB9
).- Ensure that the currency key is defined and correctly assigned to the operating concern.
Review Master Data:
- Check the master data for the operating concern, including the characteristics and value fields. Ensure that all necessary data is correctly maintained.
Verify Currency Settings:
- Check the currency settings in the controlling area (Transaction code:
OBY6
) and ensure that they are consistent with the operating concern's requirements.- Make sure that the currency types (e.g., transaction currency, group currency) are correctly defined.
Data Transfer Validation:
- If data is being transferred from another system, validate the data mapping and ensure that currency information is being correctly passed to the operating concern.
Consult Documentation:
- Review SAP documentation or notes related to the specific version of SAP you are using, as there may be additional considerations or known issues.
SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They may provide specific notes or patches that address the issue.
Related Information:
OKB9
(Operating Concern) and OBY6
(Controlling Area Settings).By following these steps, you should be able to identify and resolve the issue related to the "MQ101 Currency key cannot be determined for operating concerns" error message in SAP.
Get instant SAP help. Start your 7-day free trial now.
MQ100
Runtime forecast & already exists in phase &
What causes this issue? The forecast is to be started. A runtime forecast package already exists.System Response The system issues an error message ...
MQ099
No package found with forecast indicator (T)
What causes this issue? This error occurred after copying your changeover package to a forecast package.System Response The system issues an error m...
MQ102
Forecast package & has already been completed: phase &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MQ103
Forecast should be started for package &, phase: &
What causes this issue? You have started the runtime forecast.System Response The system issues an error message and will not allow you to continue ...
Click on this link to search all SAP messages.