How To Fix MPLAN401 - Tests started


MPLAN401 - Overview

  • Message type: E = Error

  • Message class: MPLAN - Messages for Maintenance Plan API

  • Message number: 401

  • Message text: Tests started

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPLAN401 - Tests started ?
    The SAP error message MPLAN401 typically indicates that there are issues related to the planning process in the Material Requirements Planning (MRP) module. The message "Tests started" suggests that the system is performing checks or validations during the planning run, but it may not provide specific details about the underlying issue.
    Possible Causes:
    
    Data Inconsistencies: There may be inconsistencies in the master data, such as material master records, BOMs (Bill of Materials), or routing data.
    
    Configuration Issues: Incorrect configuration settings in MRP parameters or planning strategies can lead to errors during the planning run. Missing Master Data: Required master data for materials, such as MRP views or procurement types, may be missing or incomplete. Locking Issues: If another process is locking the data that MRP needs to access, it can lead to errors. Resource Availability: If resources (like production capacity) are not available or are incorrectly defined, it can cause planning issues. Solutions: Check Master Data: Review the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker