Message type: E = Error
Message class: MPLAN - Messages for Maintenance Plan API
Message number: 325
Message text: Entered factory calendar was ignored
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPLAN325
- Entered factory calendar was ignored ?The SAP error message MPLAN325 ("Entered factory calendar was ignored") typically occurs in the context of production planning and scheduling. This message indicates that the factory calendar you have entered for a particular operation or production order is not being considered by the system, often due to a mismatch or configuration issue. Causes: Incorrect Factory Calendar Assignment: The factory calendar assigned to the material or plant may not be valid for the operation being scheduled. Non-Working Days: The factory calendar may not include the days you are trying to schedule, leading the system to ignore it.
Configuration Issues: There may be issues in the configuration of the factory calendar in the system, such as missing holidays or incorrect working hours. Master Data Issues: The material master or work center may not have the correct factory calendar assigned. Scheduling Parameters: The scheduling parameters set in the production order or planning run may not align with the factory
Get instant SAP help. Sign up for our Free Essentials Plan.
MPLAN324
Time dimension of maintenance plan must be bigger than/equal to day
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPLAN323
Maintenance cycle & does not have a counter
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPLAN326
Maintenance plan contains cycle with the number 00
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPLAN327
Maintenance plan does not contain a counter or a counter unit
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.