How To Fix MPLAN313 - Cycle & is already scheduled. Changed planned counter reading is ignored


MPLAN313 - Overview

  • Message type: E = Error

  • Message class: MPLAN - Messages for Maintenance Plan API

  • Message number: 313

  • Message text: Cycle & is already scheduled. Changed planned counter reading is ignored

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPLAN313 - Cycle & is already scheduled. Changed planned counter reading is ignored ?
    The SAP error message MPLAN313 indicates that a cycle for a maintenance plan is already scheduled, and any changes made to the planned counter reading are being ignored. This typically occurs in the context of maintenance planning and scheduling within SAP's Plant Maintenance (PM) module.
    
    Cause: Existing Schedule: The maintenance plan has already been scheduled for execution, and the system does not allow changes to the planned counter reading at this stage. Counter Readings: The planned counter reading is linked to a specific maintenance cycle, and if the cycle is already in the process of being executed or has been scheduled, any changes to the counter reading will not be accepted. System Settings: The configuration settings in the maintenance plan may restrict changes to planned counter readings once a cycle is scheduled.
    Solution: Check Scheduled Cycles: Review the maintenance plan to see if there are any scheduled cycles. If a cycle is already scheduled, you may

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker