Do you have any question about this error?
Message type: E = Error
Message class: MPE_PLAN_EXEC - Message Class for Planning to Execution
Message number: 036
Message text: No planning BOM found
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_EXEC036
- No planning BOM found ?The SAP error message MPE_PLAN_EXEC036: No planning BOM found typically occurs in the context of production planning and material requirements planning (MRP) when the system is unable to find a valid Bill of Materials (BOM) for a specific material or product during the planning process. This can hinder the ability to execute production orders or plan materials effectively.
Causes:
- Missing BOM: The most common cause is that there is no BOM created for the material in question. This can happen if the BOM has not been defined or has been deleted.
- Incorrect BOM Status: The BOM may exist but could be inactive or not valid for the specific plant or production version being used.
- Plant-Specific Issues: The BOM might be created for a different plant than the one being referenced in the planning process.
- Versioning Issues: If the BOM is version-controlled, the version being referenced may not be the correct one or may not be active.
- Material Master Data Issues: The material master data may not be correctly set up, leading to issues in BOM determination.
Solutions:
- Create or Update BOM: Check if a BOM exists for the material. If not, create a new BOM using transaction code CS01. If it exists, ensure it is correctly configured and active.
- Check BOM Status: Use transaction code CS03 to display the BOM and verify its status. Ensure that it is marked as active and valid for the relevant plant and production version.
- Verify Plant Assignment: Ensure that the BOM is assigned to the correct plant. If necessary, create a plant-specific BOM.
- Check for Versioning: If your organization uses BOM versions, ensure that the correct version is being referenced in the planning process.
- Review Material Master Data: Use transaction code MM03 to check the material master data for the relevant material. Ensure that all necessary fields are filled out correctly, especially those related to BOM and MRP.
- Run MRP: After making the necessary changes, run the MRP process again to see if the error persists.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
MPE_PLAN_EXEC035
Usage for engineering BOM has not been maintained
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_EXEC034
Recursive planning BOM is not supported
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_EXEC037
No released planning BOM found for phantom component &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_EXEC038
&1 is invalid BOM usage type
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.