How To Fix MPE_INSTALLATION_MSG079 - &1 and its parent network &2 activity &3 are not connected by precedence


MPE_INSTALLATION_MSG079 - Overview

  • Message type: E = Error

  • Message class: MPE_INSTALLATION_MSG -

  • Message number: 079

  • Message text: &1 and its parent network &2 activity &3 are not connected by precedence

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_INSTALLATION_MSG079 - &1 and its parent network &2 activity &3 are not connected by precedence ?
    The SAP error message MPE_INSTALLATION_MSG079 indicates that there is a problem with the precedence of activities in a project or network. Specifically, it means that the specified activity (activity &3) is not connected by precedence to the parent network (network &2). This can occur in various SAP modules, particularly in project management or production planning.
    
    Cause: Missing Dependencies: The activity you are trying to execute or process does not have the required predecessor or successor activities defined. This means that the system does not recognize the logical flow of tasks. Incorrect Network Configuration: The network structure may not be set up correctly, leading to disconnections between activities. Manual Changes: If changes were made manually to the network or activities, it could lead to inconsistencies in the precedence relationships. Data Integrity Issues: There may be issues with the data integrity in the project or network, such as missing links or incorrect settings.
    Solution: Check Activity Precedence: Review the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker