Message type: E = Error
Message class: MPE_INSTALLATION_MSG -
Message number: 079
Message text: &1 and its parent network &2 activity &3 are not connected by precedence
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_INSTALLATION_MSG079
- &1 and its parent network &2 activity &3 are not connected by precedence ?The SAP error message MPE_INSTALLATION_MSG079 indicates that there is a problem with the precedence of activities in a project or network. Specifically, it means that the specified activity (activity &3) is not connected by precedence to the parent network (network &2). This can occur in various SAP modules, particularly in project management or production planning.
Cause:
- Missing Dependencies: The activity you are trying to execute or process does not have the required predecessor or successor activities defined. This means that the system does not recognize the logical flow of tasks.
- Incorrect Network Configuration: The network structure may not be set up correctly, leading to disconnections between activities.
- Manual Changes: If changes were made manually to the network or activities, it could lead to inconsistencies in the precedence relationships.
- Data Integrity Issues: There may be issues with the data integrity in the project or network, such as missing links or incorrect settings.
Solution:
- Check Activity Precedence: Review the activity in question and ensure that it has the correct predecessor and successor activities defined. You can do this by navigating to the network or project structure in SAP and checking the relationships.
- Adjust Network Configuration: If the network is not configured correctly, you may need to adjust the settings to ensure that all activities are properly linked. This can involve adding missing dependencies or correcting any errors in the network structure.
- Recreate the Activity: If the activity is corrupted or incorrectly set up, consider deleting and recreating it to ensure that it is properly linked to the network.
- Use Transaction Codes: Utilize relevant transaction codes such as CJ20N (Project Builder) or CN21 (Create Network) to review and modify the network and activities.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing networks and activities in your version of SAP.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
MPE_INSTALLATION_MSG078
The networks of a nested major assembly
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_INSTALLATION_MSG077
You are not authorized to display the selected networks.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_INSTALLATION_MSG080
&1 and its parent network &2 activity &3 are not connected by FF relation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_INSTALLATION_MSG081
The networks of a nested major assembly are not connected by precedence.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.