Do you have any question about this error?
Message type: E = Error
Message class: MPE_INSTALLATION_MSG -
Message number: 066
Message text: Network has comp. demand for major assembly, but network does not exist.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_INSTALLATION_MSG066
- Network has comp. demand for major assembly, but network does not exist. ?The SAP error message MPE_INSTALLATION_MSG066 indicates that there is a discrepancy in the network planning for a major assembly. Specifically, it means that there is a component demand for a major assembly, but the corresponding network (which is typically used for production planning and execution) does not exist in the system.
Cause:
- Missing Network: The primary cause of this error is that the network required for the production of the major assembly has not been created or is not available in the system.
- Incorrect Configuration: There may be an issue with the configuration of the production process, such as missing routing or production version.
- Data Inconsistency: There could be inconsistencies in the master data, such as the bill of materials (BOM) or routing that do not align with the expected network.
- Planning Issues: The planning run may not have been executed correctly, leading to a situation where the demand is generated without the necessary network being established.
Solution:
Create the Missing Network:
- Check if the network for the major assembly exists. If it does not, you will need to create it using transaction codes like CNO1 (Create Network) or CNO2 (Change Network).
Check Routing and Production Version:
- Ensure that the routing for the major assembly is correctly defined and that a valid production version exists. You can check this using transaction codes like CA03 (Display Routing) and C223 (Display Production Version).
Review Master Data:
- Verify the BOM and routing for the major assembly to ensure they are correctly set up. Use transaction codes like CS03 (Display BOM) to check the BOM.
Run Planning Again:
- If the network has been created or corrected, run the planning process again to ensure that the demand is properly aligned with the production capabilities.
Check for Data Consistency:
- Use transaction C223 to check for any inconsistencies in the master data that might be causing the issue.
Related Information:
Transaction Codes:
Documentation: Refer to SAP Help documentation for detailed information on production planning and network management.
SAP Notes: Check for any relevant SAP Notes that might address specific issues related to this error message.
Support: If the issue persists after following the above steps, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
By addressing the underlying causes and following the suggested solutions, you should be able to resolve the error message and ensure that the production planning process runs smoothly.
Get instant SAP help. Start your 7-day free trial now.
MPE_INSTALLATION_MSG065
Material & is not an end item
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_INSTALLATION_MSG064
Network activity &1 starts before predecessor &2 starts
What causes this issue? Two network activities are connected by a precedence relationship and a start-start relationship. However, the predecessor ac...
MPE_INSTALLATION_MSG067
Nested major assembly not connected to parent
What causes this issue? A major assembly is needed for a parent installation kit and the network activity representing the installation kit and the n...
MPE_INSTALLATION_MSG068
Activity not released and starts in the past
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.