Message type: E = Error
Message class: MPE_INSTALLATION_MSG -
Message number: 028
Message text: BOM version is not latest
You have updated the BOM, but you have not yet re-exploded it.
Production engineers create BOMs for major assemblies to define the
installation kits needed to make a major assembly. Networks drive the
assembly of installation kits. The network?s BOM version is outdated,
which could result in missing installation kits.
Re-explode the current BOM version, either in this app or by using
transaction <AB>CN33_N</>.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MPE_INSTALLATION_MSG028
- BOM version is not latest ?The SAP error message MPE_INSTALLATION_MSG028 indicates that the Bill of Materials (BOM) version you are trying to use is not the latest version available in the system. This can occur in various scenarios, such as during production planning, material requirements planning, or when trying to create or modify a production order.
Cause: Outdated BOM Version: The BOM version you are referencing is older than the latest version available in the system. Data Synchronization Issues: There may be a delay in data synchronization if the BOM was recently updated. Incorrect BOM Selection: The system may be configured to use a specific BOM version that is not the latest.
Solution: Check BOM Versions: Go to the BOM transaction (e.g., CS03) and check the available versions for the material in question. Ensure that you are referencing the latest version. Update BOM Reference: If you are using a specific BOM version in your transaction, update it to the latest version. Recreate or Modify
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_INSTALLATION_MSG027
A network activity with reference point has no components assigned
What causes this issue? The network was copied from an earlier project, but the current project does not require the network activity, the BOM item h...
MPE_INSTALLATION_MSG026
Reference point in BOM and routing differs
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_INSTALLATION_MSG029
Component not assigned to Activity
What causes this issue? Why is it relevant? Every demand for an installation kit should be assigned to a network activity to define the sequence in w...
MPE_INSTALLATION_MSG030
Reference activity does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.