Do you have any question about this error?
Message type: E = Error
Message class: MPE_INSTALLATION_MSG -
Message number: 026
Message text: Reference point in BOM and routing differs
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_INSTALLATION_MSG026
- Reference point in BOM and routing differs ?The SAP error message MPE_INSTALLATION_MSG026 indicates that there is a discrepancy between the reference point defined in the Bill of Materials (BOM) and the routing for a particular material. This error typically arises during the production planning or execution processes when the system detects that the reference points do not match, which can lead to issues in production scheduling and material requirements.
Cause:
- Mismatch in Reference Points: The reference point in the BOM (which indicates where the components are to be used in the production process) does not align with the reference point in the routing (which defines the sequence of operations and the work centers involved).
- Changes in BOM or Routing: If there have been recent changes to either the BOM or the routing, and these changes were not synchronized, it can lead to this error.
- Incorrect Configuration: The configuration settings for the BOM or routing may not be set up correctly, leading to inconsistencies.
Solution:
Check BOM and Routing:
- Review the BOM and routing for the material in question. Ensure that the reference points are consistent across both documents.
- You can use transaction codes like
CS03
(Display BOM) andCA03
(Display Routing) to check the details.Synchronize Changes:
- If changes were made to either the BOM or routing, ensure that they are updated and synchronized. This may involve updating the reference points to match or adjusting the BOM/routing as necessary.
Adjust Reference Points:
- If the reference points are indeed different and should be, you may need to adjust one of them to ensure they align. This could involve changing the BOM or routing to reflect the correct reference point.
Consult Documentation:
- Review any relevant documentation or guidelines for your specific SAP implementation to ensure that you are following the correct procedures for managing BOMs and routings.
Testing:
- After making adjustments, perform a test run to ensure that the error does not reoccur and that production can proceed without issues.
Related Information:
CS01
(Create BOM), CS02
(Change BOM), CA01
(Create Routing), and CA02
(Change Routing) for managing BOMs and routings.By following these steps, you should be able to resolve the MPE_INSTALLATION_MSG026 error and ensure that your BOM and routing are correctly aligned for production processes.
Get instant SAP help. Start your 7-day free trial now.
MPE_INSTALLATION_MSG025
BOM item not in networkÆs components
What causes this issue? Component requirements are missing if there is no network activity with a matching reference point and if the component requi...
MPE_INSTALLATION_MSG024
BOM item not in networkÆs components
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_INSTALLATION_MSG027
A network activity with reference point has no components assigned
What causes this issue? The network was copied from an earlier project, but the current project does not require the network activity, the BOM item h...
MPE_INSTALLATION_MSG028
BOM version is not latest
What causes this issue? You have updated the BOM, but you have not yet re-exploded it.System Response Production engineers create BOMs for major ass...
Click on this link to search all SAP messages.