Message type: E = Error
Message class: MM - Messages for material master maintenance and Customizing
Message number: 018
Message text: No checks are carried out during initialization
You wanted to run the period closing program with the option
"Initialize", and have selected <LS>Check period only</>.
Since no checks are made during initialization, this combination of
entries does not make sense.
Check your entries.
Error message extract from SAP system. Copyright SAP SE.
MM018
- No checks are carried out during initialization ?The SAP error message MM018 ("No checks are carried out during initialization") typically occurs in the context of material management (MM) processes, particularly when dealing with material master data or during the initialization of certain transactions. This message indicates that the system is not performing the expected checks during the initialization phase of a process, which can lead to issues in data integrity or process execution.
Cause:
Configuration Issues: The error may arise due to incorrect configuration settings in the material management module. This could involve settings related to material types, valuation classes, or other related parameters. Missing Data: If certain required data is missing or not properly maintained in the material master, the system may skip checks. Custom Development: If there are custom enhancements or modifications in the system, they might interfere with the standard checks. User Authorizations: Sometimes, insufficient user authorizations can lead to the system not performing checks as expected.
Solution: Check Configuration: Review
Get instant SAP help. Sign up for our Free Essentials Plan.
MM017
The material ledger is active; you cannot initialize valuation area &
What causes this issue? You have tried to initialize valuation areas by running the period closing program. This is not possible since the material l...
MM016
Follow the instructions in Note 487381 before initialization
What causes this issue? You want to run the period initialization program. Note that when you start the period closing with initialization, inconsist...
MM019
The sales unit for the material & may not be deleted
What causes this issue? The unit of measure is used as the <DS:GLOS.3526C7F2AFAB52B9E10000009B38F974>sales unit</> and cannot therefore b...
MM020
The unit & is still used as the order unit for supplier &
What causes this issue? The unit of measure &V1& is still used as the <DS:GLOS.order_unit>order unit</> in at least one <DS:GL...
Click on this link to search all SAP messages.