How To Fix MLCCS401 - Actual cost component split is inconsistent; see long text


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MLCCS - Message for Actual Costing

  • Message number: 401

  • Message text: Actual cost component split is inconsistent; see long text

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MLCCS401 - Actual cost component split is inconsistent; see long text ?

    The SAP error message MLCCS401 indicates that there is an inconsistency in the actual cost component split for a particular transaction or document. This error typically arises in the context of Material Ledger and actual costing, where the system expects a certain structure or distribution of costs across different cost components, but finds that the actual data does not match this expectation.

    Cause:

    1. Inconsistent Cost Component Split: The actual costs recorded for a material do not align with the expected cost component structure. This can happen if:

      • The cost component split is not properly defined in the material master.
      • There are discrepancies in the cost component splits between different documents (e.g., purchase orders, production orders).
      • Manual adjustments or postings have been made that do not conform to the expected splits.
    2. Configuration Issues: There may be issues with the configuration of the Material Ledger or the actual costing settings in the system.

    3. Data Entry Errors: Incorrect data entry during transactions can lead to inconsistencies in the cost component splits.

    Solution:

    1. Check Cost Component Split: Review the cost component split for the affected material. You can do this by:

      • Navigating to the material master and checking the accounting view.
      • Using transaction codes like CK13N (Display Material Cost Estimate) to see the cost breakdown.
    2. Review Related Documents: Check the related documents (e.g., purchase orders, production orders) to ensure that the cost component splits are consistent across all relevant transactions.

    3. Adjust Cost Component Configuration: If the cost component structure is not set up correctly, you may need to adjust the configuration in the Material Ledger settings. This may involve:

      • Ensuring that the cost component structure is correctly defined in the controlling area.
      • Verifying that the cost component splits are correctly assigned to the relevant materials.
    4. Repost Transactions: If there are discrepancies due to manual postings or errors, you may need to reverse and repost the affected transactions to ensure that they conform to the expected cost component splits.

    5. Consult Documentation: Refer to SAP documentation or help files for more detailed guidance on resolving cost component split issues.

    6. Contact SAP Support: If the issue persists and you cannot identify the cause, consider reaching out to SAP support for assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as:

      • CK11N: Create Material Cost Estimate
      • CK13N: Display Material Cost Estimate
      • CK40N: Change Material Cost Estimate
      • CKMLCP: Actual Costing/Material Ledger: Periodic Unit Price Calculation
    • Material Ledger Configuration: Understanding the configuration settings for the Material Ledger and actual costing can help prevent such issues in the future.

    • Cost Component Structure: Review the cost component structure in your organization to ensure it aligns with your accounting practices and reporting requirements.

    By following these steps, you should be able to identify and resolve the inconsistency causing the MLCCS401 error message in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker