Do you have any question about this error?
Message type: E = Error
Message class: MLCCS - Message for Actual Costing
Message number: 003
Message text: Cost component structure for period &3 / &2 in plant &1 not found
No cost component structure was found in valuation &v4& for period &v3&
/ &v2& in plant &v1&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MLCCS003
- Cost component structure for period &3 / &2 in plant &1 not found ?The SAP error message MLCCS003 indicates that the system is unable to find a cost component structure for a specific period and plant. This error typically arises in the context of cost accounting and controlling, particularly when dealing with cost component structures in the Material Ledger or during the costing process.
Cause:
- Missing Cost Component Structure: The primary cause of this error is that the cost component structure has not been defined for the specified plant and period.
- Incorrect Configuration: There may be a configuration issue where the cost component structure is not properly assigned to the relevant controlling area or plant.
- Period Not Open: The period for which the cost component structure is being requested may not be open for posting.
- Data Migration Issues: If data has been migrated from another system, the cost component structure may not have been transferred correctly.
Solution:
Define Cost Component Structure:
- Go to the transaction code OKTZ (Cost Component Structure) and check if the cost component structure exists for the specified plant and period.
- If it does not exist, you will need to create it or assign an existing one.
Check Configuration:
- Ensure that the cost component structure is assigned to the relevant controlling area and that it is correctly configured.
- Use transaction code OKKP to check the controlling area settings.
Open the Period:
- Verify that the period in question is open for posting. You can check this in the transaction code OB52 (Open and Close Posting Periods).
- If the period is closed, you may need to open it temporarily to allow for the necessary postings.
Review Migration Data:
- If this issue arose after a data migration, review the migration process to ensure that all necessary configurations and data were transferred correctly.
Consult Documentation:
- Refer to SAP documentation or help resources for additional guidance on setting up cost component structures.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant specializing in Controlling (CO) for further assistance.
Get instant SAP help. Start your 7-day free trial now.
MLCCS002
Actual cost component split not active for company code &1
What causes this issue? You want to use use actual cost component split functionality in company code &v1&, but you must first activate actua...
MLCCS001
Actual cost component split not active for plant &1
What causes this issue? You want to use the actual cost component split functionality in plant &v1&, but first you must set actual cost compo...
MLCCS004
Cost component structure for period &3 / &2 in company code &1 not found
What causes this issue? No cost component structure was found in valuation &v4& for the periods &v3& / &v2& in company code &...
MLCCS005
Actual cost component split for trans.-based pr. determ. does not exist
What causes this issue? Actual cost component splits are only calculated for materials that have the indicator 'ML active' set in the accou...
Click on this link to search all SAP messages.