Do you have any question about this error?
Message type: E = Error
Message class: MA - Sales and Operations Planning
Message number: 670
Message text: Date of events & lies outside the planning period
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MA670
- Date of events & lies outside the planning period ?The SAP error message MA670 ("Date of events & lies outside the planning period") typically occurs in the context of Material Requirements Planning (MRP) or production planning when the system encounters a date that is outside the defined planning horizon. This can happen during various processes, such as creating or changing production orders, sales orders, or during MRP runs.
Cause:
- Planning Period Configuration: The planning period may not be set correctly in the system. This could be due to the configuration of the planning parameters in the material master or the MRP settings.
- Date Mismatch: The date of the event (e.g., production order start date, delivery date) is outside the range defined in the planning parameters.
- Master Data Issues: The material master data may not be correctly maintained, leading to incorrect planning dates.
- MRP Type: The MRP type assigned to the material may not be suitable for the planning scenario being executed.
Solution:
Check Planning Period Settings:
- Go to the configuration settings for MRP and check the planning horizon settings. Ensure that the planning period is set to cover the dates you are working with.
- You can check the planning period in the material master under the MRP 2 view.
Adjust Event Dates:
- Review the dates of the events (e.g., production orders, sales orders) and ensure they fall within the defined planning period. If necessary, adjust the dates to be within the planning horizon.
Review Material Master Data:
- Check the material master data for the relevant material. Ensure that all necessary fields are filled out correctly, especially those related to MRP and planning.
MRP Type Review:
- Verify the MRP type assigned to the material. If the MRP type is not appropriate for the planning scenario, consider changing it to a more suitable type.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on how to configure planning periods and MRP settings.
Testing:
- After making changes, perform a test run to ensure that the error does not reoccur.
Related Information:
MD04
(Stock/Requirements List) or MD01
(MRP Run) to analyze the planning situation.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP MRP and production planning.
Get instant SAP help. Start your 7-day free trial now.
MA669
Preiod unit & & is not possible under &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA668
No technical period generated for level-by-level planning
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA671
The technical periods used do not contain any posting periods
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA672
Disag. only possible from the key fig. view - Members contain neg. values
What causes this issue? The members of the hierarchy level to which you want to change contain both positive and negative values. The sum of these me...