Do you have any question about this error?
Message type: E = Error
Message class: MA - Sales and Operations Planning
Message number: 668
Message text: No technical period generated for level-by-level planning
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MA668
- No technical period generated for level-by-level planning ?The SAP error message MA668 ("No technical period generated for level-by-level planning") typically occurs in the context of Material Requirements Planning (MRP) when the system is unable to generate a technical period for level-by-level planning. This can happen for several reasons, and understanding the cause is essential for resolving the issue.
Causes:
- Missing Master Data: The relevant master data (like Material Master, BOM, or Routing) may not be correctly maintained or may be missing.
- Planning Parameters: Incorrect planning parameters or settings in the MRP configuration can lead to this error.
- Planning File Entries: The planning file entries may not be correctly set up or may be missing for the materials involved.
- Technical Period Settings: The settings for the technical period in the MRP configuration may not be defined correctly.
- Date Issues: The dates for the planning horizon may not be set correctly, leading to no valid periods being available for planning.
Solutions:
- Check Master Data: Ensure that all relevant master data is correctly maintained. This includes checking the Material Master, BOM, and Routing for the materials involved.
- Review MRP Settings: Go through the MRP configuration settings to ensure that all parameters are set correctly. This includes checking the planning strategy and MRP type.
- Check Planning File Entries: Use transaction code MD21 to check the planning file entries for the materials. If entries are missing, you may need to run MRP again to generate them.
- Verify Technical Period Settings: Check the settings for the technical period in the MRP configuration (transaction code OMD0) to ensure they are defined correctly.
- Adjust Planning Horizon: Make sure that the planning horizon is set correctly in the MRP settings. You can adjust the planning horizon in the MRP view of the Material Master.
- Run MRP: After making the necessary adjustments, run the MRP again to see if the error persists.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.
Get instant SAP help. Start your 7-day free trial now.
MA667
No period split defined. You are planning in technical periods.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA666
Planning object & cannot be saved
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA669
Preiod unit & & is not possible under &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA670
Date of events & lies outside the planning period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.