Message type: E = Error
Message class: MA - Sales and Operations Planning
Message number: 085
Message text: Posting periods and months cannot be planned simultaneously
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MA085
- Posting periods and months cannot be planned simultaneously ?The SAP error message MA085, which states "Posting periods and months cannot be planned simultaneously," typically occurs in the context of planning in SAP, particularly when dealing with Material Requirements Planning (MRP) or similar modules. This error indicates that there is a conflict in the planning settings where both posting periods and months are being used simultaneously, which is not allowed.
Cause: The error arises when: Configuration Settings: The planning configuration in SAP is set to allow either monthly planning or period-based planning, but not both at the same time. Master Data Settings: The material master or planning parameters may have been set incorrectly, leading to a conflict in how the system is trying to process the planning data. Planning Layout: The planning layout or the planning version may be configured to use both periods and months, which is not permissible.
Solution: To resolve the MA085 error, you can take the following steps: Check Planning Configuration: Go to the
Get instant SAP help. Sign up for our Free Essentials Plan.
MA084
Different fiscal year variants cannot be planned simultaneously
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA083
Date & not in planning horizon (valid date will be set)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA086
Create methods with usage &, &, or &
What causes this issue? You have tried to create a method of a usage other than B, Y, or P.System Response The action is not allowed with this trans...
MA087
Not possible to maintain long text for this charact. values combination
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.