Do you have any question about this error?
Message type: E = Error
Message class: M7 - Inventory Management and Physical Inventory
Message number: 539
Message text: Follow-up material for &: & from &
Material &V1& is a material to be discontinued. After the effective out
date (&V3&), it will be replaced by material &V2& as soon as the
present stock has been used up. As of this date, the system will switch
any independent requirements in MRP, that are no longer covered by
existing warehouse stock, to the follow-up material &V2&.
Depending on how the system is set, this message is either a warning or
an error message.
If this message is an error message, you can only reserve the follow-up
material for the requirements date specified by you. If it is
absolutely necessary to reserve the material to be discontinued, you
must enter a date that precedes the effective out date.
If this message is a warning, it is still possible to reserve the
material to be discontinued. As of the effective out date, the
requirements are switched to the follow-up material.
Error message extract from SAP system. Copyright SAP SE.
M7539
- Follow-up material for &: & from & ?The SAP error message M7539 typically indicates an issue related to the follow-up material in the context of inventory management or production planning. This error often arises when there is a problem with the configuration or data related to the materials involved in a transaction.
Cause:
- Missing Follow-Up Material: The follow-up material specified in the transaction may not be defined in the system.
- Incorrect Configuration: The configuration settings for the materials may not be set up correctly, leading to inconsistencies.
- Data Inconsistencies: There may be inconsistencies in the master data for the materials involved, such as missing or incorrect entries in the material master.
- Transaction Type Issues: The transaction type being used may not support the follow-up material functionality.
Solution:
- Check Material Master: Verify that the follow-up material exists in the material master. Ensure that it is correctly defined and active.
- Review Configuration: Check the configuration settings for the materials involved. Ensure that the follow-up material is properly configured in the relevant settings (e.g., in the material type or movement type settings).
- Data Consistency Check: Run consistency checks on the material master data to identify any discrepancies or missing information.
- Transaction Type Validation: Ensure that the transaction type being used supports the follow-up material functionality. If necessary, consult with your SAP configuration team to adjust the settings.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the error message and related processes.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
M7538
Internal error in BOM explosion
What causes this issue? Due to an incorrect parameter combination, the system could not explode the bill of material.System Response The system issu...
M7537
You are not authorized to explode the bill of material
What causes this issue? Due to the settings in your user master record, you are not authorized to explode the bill of material.System Response The s...
M7542
Of material & for & only & & exist
What causes this issue? During the dynamic <DS:GLOS.3526C4D5AFAB52B9E10000009B38F974>availability check,</> the system determined that th...
M7545
Not all reservations could be blocked
What causes this issue? You have chosen the 'Block all reservation headers' option. The system could not carry out this function because re...
Click on this link to search all SAP messages.