Message type: E = Error
Message class: M3 - Material Master
Message number: 712
Message text: Date & for the planned change is not in the future
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
M3712
- Date & for the planned change is not in the future ?The SAP error message M3712 ("Date & for the planned change is not in the future") typically occurs in the context of materials management or production planning when a user attempts to make a change to a planned order, production order, or similar document, and the date specified for the change is not a future date.
Cause:
- Incorrect Date Entry: The date entered for the planned change is either today’s date or a past date.
- System Configuration: The system may have specific settings that restrict changes to planned orders or production orders based on date criteria.
- Business Logic: The business process may dictate that changes can only be made for future dates to ensure proper planning and scheduling.
Solution:
- Check the Date: Ensure that the date you are trying to enter for the planned change is indeed a future date. If you are trying to change something for today or a past date, you will need to adjust your planning accordingly.
- Adjust the Change Date: If you need to make a change, select a date that is in the future relative to the current date.
- Review Business Processes: Consult with your business process owner or SAP functional consultant to understand if there are specific rules or configurations that need to be adhered to when making changes to planned orders.
- System Settings: If you believe the error is due to system settings, you may need to check the configuration in the relevant SAP modules (like MM or PP) to see if there are any restrictions on changing orders based on dates.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a technical consultant for further investigation.
Get instant SAP help. Start your 7-day free trial now.
M3711
Different base units of measure have been specified
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
M3710
Valid-from date & is in the future
What causes this issue? The valid-from date of the change number specified is in the future. However, with this function, you may specify only change...
M3713
Valid-from date & / change planned for &
What causes this issue? The change number has the valid-from date &V1&. However, the change is scheduled for &V2&. As a result, the c...
M3714
The main EAN for the unit of measure & is not unique
What causes this issue? You wanted to assign additional <DS:GLOS.International_Article_Number>EANs</> to a unit of measure. You have ente...
Click on this link to search all SAP messages.