Message type: E = Error
Message class: M3 - Material Master
Message number: 585
Message text: Not possible to plan this material since it is a planning material
The material in this plant is already being used as a planning material
in another material master record.
Since only single-level planning is possible, you cannot assign a
planning material.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
M3585
- Not possible to plan this material since it is a planning material ?The SAP error message M3585 indicates that the system cannot plan a specific material because it is classified as a "planning material." This typically occurs in the context of materials that are set up in a way that they should not be directly planned or managed in the same way as standard materials.
Cause:
- Material Type: The material is defined as a planning material in the material master. This means it is intended to be used in a planning context, such as a component in a bill of materials (BOM) or a product in a planning scenario, rather than being planned directly.
- Planning Strategy: The planning strategy assigned to the material may restrict direct planning. For example, materials with certain strategies (like make-to-order) may not be planned in the same way as stock materials.
- Configuration Settings: The configuration settings in the system may prevent planning for certain materials based on their characteristics or the way they are set up in the system.
Solution:
Check Material Master Data: Review the material master data for the affected material. Look at the following:
- Material type
- Planning strategy
- MRP type
- Check if the material is marked as a planning material.
If the material should not be a planning material, you may need to change its settings.
Change Material Type or Planning Strategy: If the material is incorrectly classified, you may need to change its material type or planning strategy to allow for planning. This can be done through transaction codes like MM02 (Change Material) or by consulting with your SAP configuration team.
Use Alternative Planning Methods: If the material is intended to be a planning material, consider using alternative planning methods, such as planning at a higher level (e.g., planning at the product level rather than the component level).
Consult Documentation: Review SAP documentation or consult with your SAP support team for specific guidelines on handling planning materials and the implications of changing their settings.
Check for Dependencies: Ensure that there are no dependencies or links to other materials or processes that might be affected by changing the planning status of the material.
Related Information:
If you continue to face issues, it may be beneficial to engage with your SAP support team or a consultant who specializes in SAP materials management.
Get instant SAP help. Start your 7-day free trial now.
M3584
Planning material/plant is itself planned via & &
What causes this issue? A planning material has already been assigned to the combination of planning material and planning plant that you have entere...
M3583
Enter a planning plant
What causes this issue? You have entered a planning material but no planning plant. However, if you enter a planning material you must always enter a...
M3586
System error in blocking the planning material
What causes this issue? A serious system error has occurred.How to fix this error? INCLUDE NA_SYSTVERW ID TXError message extract from SAP system. C...
M3587
The planning material & is locked by the user &
What causes this issue? The planning material &V1& is being processed by user &V2& and is therefore locked.System Response The plann...
Click on this link to search all SAP messages.