How To Fix M3282 - MRP controller & is not defined in plant &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: M3 - Material Master

  • Message number: 282

  • Message text: MRP controller & is not defined in plant &

  • Show details Hide details
  • INCLUDE NA_WERTEKOMB

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message M3282 - MRP controller & is not defined in plant & ?

    The SAP error message M3282 indicates that the MRP (Material Requirements Planning) controller is not defined for a specific plant in the system. This error typically arises during the planning process when the system attempts to execute MRP and cannot find a valid MRP controller assigned to the specified plant.

    Cause:

    1. Missing MRP Controller Assignment: The most common cause is that the MRP controller has not been assigned to the plant in the material master data.
    2. Incorrect Configuration: There may be an issue with the configuration settings in the MRP area or the plant settings.
    3. Data Inconsistency: There could be inconsistencies in the master data or configuration that prevent the system from recognizing the MRP controller.

    Solution:

    To resolve the M3282 error, follow these steps:

    1. Check Material Master Data:

      • Go to the material master record for the affected material using transaction code MM03.
      • Navigate to the MRP view and check if the MRP controller is assigned. If it is missing, you will need to assign a valid MRP controller.
    2. Assign MRP Controller:

      • If the MRP controller is not defined, you can assign it by using transaction code MM02 (Change Material) and updating the MRP view.
      • Ensure that the MRP controller is valid and exists in the system.
    3. Check MRP Controller Configuration:

      • Use transaction code OMMR to check the configuration of MRP controllers.
      • Ensure that the MRP controller is correctly defined and linked to the relevant plant.
    4. Review Plant Settings:

      • Check the plant settings in transaction code SPRO (SAP Reference IMG) under the MRP section to ensure that the plant is correctly configured to use MRP.
    5. Consult Documentation:

      • If you are unsure about the correct MRP controller to use, consult your organization's documentation or speak with your SAP functional consultant.
    6. Test MRP Run:

      • After making the necessary changes, perform a test MRP run to ensure that the error is resolved.

    Related Information:

    • MRP Controller: This is a key element in the MRP process, responsible for planning and managing materials. Each MRP controller can be assigned to multiple materials and plants.
    • Transaction Codes:
      • MM03: Display Material Master
      • MM02: Change Material Master
      • OMMR: MRP Controller Configuration
      • SPRO: SAP Reference IMG for configuration settings
    • Documentation: Always refer to SAP Help documentation or your internal guidelines for specific configurations and best practices.

    By following these steps, you should be able to resolve the M3282 error and ensure that your MRP process runs smoothly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant