Message text: MRP controller & is not defined in plant &
Error message extract from SAP system. Copyright SAP SE.
M3282
- MRP controller & is not defined in plant & ?The SAP error message M3282 indicates that the MRP (Material Requirements Planning) controller is not defined for a specific plant in the system. This error typically arises during the planning process when the system attempts to execute MRP and cannot find a valid MRP controller assigned to the specified plant.
Cause:
- Missing MRP Controller Assignment: The most common cause is that the MRP controller has not been assigned to the plant in the material master data.
- Incorrect Configuration: There may be an issue with the configuration settings in the MRP area or the plant settings.
- Data Inconsistency: There could be inconsistencies in the master data or configuration that prevent the system from recognizing the MRP controller.
Solution:
To resolve the M3282 error, follow these steps:
Check Material Master Data:
- Go to the material master record for the affected material using transaction code
MM03
.- Navigate to the MRP view and check if the MRP controller is assigned. If it is missing, you will need to assign a valid MRP controller.
Assign MRP Controller:
- If the MRP controller is not defined, you can assign it by using transaction code
MM02
(Change Material) and updating the MRP view.- Ensure that the MRP controller is valid and exists in the system.
Check MRP Controller Configuration:
- Use transaction code
OMMR
to check the configuration of MRP controllers.- Ensure that the MRP controller is correctly defined and linked to the relevant plant.
Review Plant Settings:
- Check the plant settings in transaction code
SPRO
(SAP Reference IMG) under the MRP section to ensure that the plant is correctly configured to use MRP.Consult Documentation:
- If you are unsure about the correct MRP controller to use, consult your organization's documentation or speak with your SAP functional consultant.
Test MRP Run:
- After making the necessary changes, perform a test MRP run to ensure that the error is resolved.
Related Information:
MM03
: Display Material MasterMM02
: Change Material MasterOMMR
: MRP Controller ConfigurationSPRO
: SAP Reference IMG for configuration settingsBy following these steps, you should be able to resolve the M3282 error and ensure that your MRP process runs smoothly.
Get instant SAP help. Start your 7-day free trial now.
M3281
Enter an MRP profile
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
M3280
Reference profile & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
M3283
MRP controller & not defined as buyer
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
M3284
Planned delivery time is 0 for ext. procured material
What causes this issue? You are creating a master record for a material that is to be procured externally. However, you have not entered a planned de...
Click on this link to search all SAP messages.