Do you have any question about this error?
Message type: E = Error
Message class: LR - CATS: Cross-Application Time Sheet
Message number: 270
Message text: Unit & not permitted with an activity allocation
You have entered a unit of measure with an activity allocation.
However, this is not permitted.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Delete the unit of measure.
Error message extract from SAP system. Copyright SAP SE.
LR270
- Unit & not permitted with an activity allocation ?The SAP error message LR270 ("Unit & not permitted with an activity allocation") typically occurs when there is a mismatch between the unit of measure (UoM) defined for an activity allocation and the unit of measure that is being used in the transaction. This error is common in scenarios involving cost allocations, especially when dealing with activity-based costing.
Cause:
- Unit of Measure Mismatch: The unit of measure defined for the activity allocation does not match the unit of measure of the cost object or the activity being allocated.
- Configuration Issues: The configuration settings in the SAP system for the activity type or cost center may not allow the specified unit of measure.
- Incorrect Master Data: The master data for the activity type, cost center, or other related objects may not be set up correctly, leading to this error.
Solution:
Check Unit of Measure:
- Verify the unit of measure defined for the activity allocation in the configuration settings.
- Ensure that the unit of measure used in the transaction matches the one defined in the activity type or cost center.
Review Configuration:
- Go to the configuration settings for the activity type and check the allowed units of measure.
- Ensure that the activity type is configured to accept the unit of measure you are trying to use.
Adjust Master Data:
- Review the master data for the relevant cost center, activity type, and any other related objects to ensure that they are set up correctly.
- If necessary, update the master data to include the correct unit of measure.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on configuring activity allocations and units of measure.
Testing:
- After making the necessary changes, perform a test transaction to ensure that the error is resolved.
Related Information:
KP26
(Activity Type Planning) or KS01
(Create Cost Center) to check or modify the relevant settings.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in controlling (CO) or financial accounting (FI) within SAP.
Get instant SAP help. Start your 7-day free trial now.
LR269
Currency not permitted with attendance or absence
What causes this issue? You have entered a currency with an attendance or absence type. However, this is not permitted.System Response The system is...
LR268
Currency not permitted with activity allocation
What causes this issue? You have entered a currency with an activity allocation (purchase order, PO item, service number). However, this is not permi...
LR271
Unit & not permitted with a confirmation
What causes this issue? You have entered a unit of measure with a confirmation. However, this is not permitted.System Response The system issues an ...
LR272
Unit & not permitted with an attendance or absence
What causes this issue? You have entered a unit of measure with an attendance or absence type. However, this is not permitted.System Response The sy...
Click on this link to search all SAP messages.