How To Fix LD416 - Please firstly maintain the number of takts for this hierarchy.


LD416 - Overview

  • Message type: E = Error

  • Message class: LD - Logistics Automotive Line Design

  • Message number: 416

  • Message text: Please firstly maintain the number of takts for this hierarchy.

  • Show details Hide details
  • What causes this issue?

    You are trying to define a line segment as a sort buffer. The number of
    takts, which will define the length of the actual production line, is
    maintained above the selected line segment.
    Sort buffers can only be defined if the number of takts is not to be
    maintained at a higher level than the level at which you want to define
    the sort buffer. This restriction means that the location of the sort
    buffer on the production line can be determined.

    System Response

    The selected line segment cannot be defined as a sort buffer.

    How to fix this error?

    Make sure that the number of takts is maintained at the same level or
    at a lower level than that on which you want to define the sort buffer.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message LD416 - Please firstly maintain the number of takts for this hierarchy. ?
    The SAP error message LD416, which states "Please firstly maintain the number of takts for this hierarchy," typically occurs in the context of production planning and control, particularly when dealing with takt time settings in a production environment.
    
    Cause: The error arises when you attempt to perform an action related to production planning (such as creating or modifying a production order or a planning hierarchy) without having defined the necessary takt time for the relevant hierarchy. Takt time is a critical metric in lean manufacturing that helps to balance production rates with customer demand.
    Solution: To resolve this error, you need to maintain the number of takts for the relevant hierarchy. Here are the steps to do this: Access the Takt Time Configuration: Go to the SAP Easy Access screen. Navigate to the relevant transaction for maintaining takt times. This is usually found under the Production Planning (PP) module. Maintain Takt Time: Find the hierarchy or production line for

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author