Do you have any question about this error?
Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 511
Message text: The period of plan/SOP order &1 does not fall in execution period
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KW511
- The period of plan/SOP order &1 does not fall in execution period ?The SAP error message KW511 indicates that there is a mismatch between the planning or SOP (Sales and Operations Planning) order period and the execution period defined in the system. This typically occurs when you are trying to execute or process a plan or SOP order that falls outside the defined execution period.
Cause:
- Execution Period Settings: The execution period for the planning or SOP order is not aligned with the period in which the order is scheduled. This can happen if the order is set for a future date that is beyond the execution period defined in the system.
- Master Data Configuration: The configuration of the planning parameters or the master data (like the planning calendar) may not be set correctly, leading to discrepancies in the execution periods.
- Date Settings: The dates in the planning order may have been incorrectly set, either manually or through a planning run, causing them to fall outside the allowed execution window.
Solution:
Check Execution Period Settings: Review the execution period settings in the system. You can do this by navigating to the relevant configuration settings in SAP (usually found in the planning area settings). Ensure that the execution period encompasses the dates of the plan/SOP order.
Adjust Planning Order Dates: If the planning order dates are incorrect, you may need to adjust them to fall within the execution period. This can be done by editing the order directly in the system.
Review Master Data: Check the master data related to the planning area, including the planning calendar and any relevant parameters that define the execution period. Make sure they are set up correctly.
Re-run Planning: If the issue arose after a planning run, consider re-running the planning process to ensure that all orders are generated with the correct dates.
Consult Documentation: Refer to SAP documentation or help resources for specific details on how to configure execution periods and planning parameters.
Related Information:
MD61
(Create Planning) or MD02
(Single-item, Multi-level Planning) to manage planning orders.If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in SAP planning modules.
Get instant SAP help. Start your 7-day free trial now.
KW510
Planning locked by user &
What causes this issue? DEFINE &USER& = &V1& INCLUDE MESSAGE_ENQUEUE_USER OBJECT DOKU ID TX User &V1& is planning in controll...
KW509
Plant & belongs to another controlling area
What causes this issue? The plant you chose, &V1&, belongs to controlling area &V2&. However, you are presently working with controll...
KW520
Overhead group &1 of material &2 in plant &3 contains errors
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KW550
******** Messages for Template-Activity Allocation**************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.