How To Fix KW415 - No valid period span for tables with business processes.


KW415 - Overview

  • Message type: E = Error

  • Message class: KW - CO-ABC Activity-Based Costing

  • Message number: 415

  • Message text: No valid period span for tables with business processes.

  • Show details Hide details
  • What causes this issue?

    Not used

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?


    Error message extract from SAP system. Copyright SAP SE.


KW415 - Details

  • The SAP error message KW415 "No valid period span for tables with business processes" typically occurs in the context of SAP Controlling (CO) or when dealing with the Profitability Analysis (CO-PA) module. This error indicates that there is an issue with the period settings or the configuration of the business processes in the system.
    
    Cause: Invalid Period Settings: The error often arises when the period settings for the business processes are not correctly defined or are missing. This can happen if the fiscal year variant is not properly configured or if the periods are not open for posting. Missing Configuration: If the business processes or the related tables are not properly configured in the system, it can lead to this error. This includes missing entries in the configuration tables that define the valid periods for the business processes. Data Consistency Issues: There may be inconsistencies in the data that prevent the system from determining

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


KW415 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author