Do you have any question about this error?
Message type: E = Error
Message class: KV - Variance Analysis for Cost Centers and Cost Objects
Message number: 090
Message text: Job scheduling is now automatic with respect to plant
You did not specify a plant for collective processing. The transaction
will therefore be run for the entire controlling area.
A separate job will be created for each plant in your controlling area.
Under certain conditions you may be able to run these jobs in
parallel, which greatly reduces the total run time. In this case, you
can only use a work list to a limited extent, since the work list will
be continually overwritten. At the end you will have only the work list
of the last job.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KV090
- Job scheduling is now automatic with respect to plant ?The SAP error message KV090 indicates that job scheduling for a specific plant is now automatic. This message typically arises in the context of production planning and control, particularly when dealing with scheduling jobs in the SAP system.
Cause:
The error message KV090 usually occurs due to the following reasons:
- Automatic Job Scheduling Configuration: The system has been configured to automatically schedule jobs for the specified plant, which may conflict with manual scheduling attempts.
- Settings in the Plant Configuration: The plant settings may have been changed to enable automatic scheduling, which overrides any manual scheduling attempts.
- User Authorization: The user may not have the necessary authorizations to manually schedule jobs if the system is set to automatic scheduling.
Solution:
To resolve the KV090 error, consider the following steps:
Check Plant Settings:
- Navigate to the configuration settings for the plant in question.
- Verify if the automatic job scheduling option is enabled. If you need to schedule jobs manually, you may need to disable this option.
Review Scheduling Parameters:
- Check the scheduling parameters in the production planning module to ensure they align with your requirements.
- If necessary, adjust the parameters to allow for manual scheduling.
User Authorizations:
- Ensure that the user attempting to schedule the job has the appropriate authorizations to perform manual scheduling.
- Consult with your SAP security team to review and adjust user roles if needed.
Consult Documentation:
- Refer to SAP documentation or help files related to job scheduling and production planning for more detailed guidance on configuration and troubleshooting.
SAP Notes and Support:
- Check for any relevant SAP Notes that may address this specific error message or provide additional insights.
- If the issue persists, consider reaching out to SAP support for further assistance.
Related Information:
MD01
(MRP Run), COHV
(Mass Processing of Production Orders), and C223
(Maintain Production Scheduling Profile).By following these steps, you should be able to address the KV090 error and ensure that job scheduling aligns with your operational needs.
Get instant SAP help. Start your 7-day free trial now.
KV089
Selected lines deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KV088
Worklist for transaction & saved
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KV091
Time: &1&2&3&4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KV092
Administration records for transaction & deleted from INDX file
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.