Message type: E = Error
Message class: KT - RK Message Table Maintenance
Message number: 350
Message text: Valuation variants &1 &2 for CO resources do not yet exist
The valuation variants &V1& &V2& for CO resources do not yet exist.
Valuation variants &V1& &V2& cannot be assigned to the plan version.
Create valuation variants &V1& &V2&.
Error message extract from SAP system. Copyright SAP SE.
KT350
- Valuation variants &1 &2 for CO resources do not yet exist ?The SAP error message KT350 indicates that there is an issue with the valuation variants for Controlling (CO) resources. Specifically, it means that the system cannot find the specified valuation variants for the given CO resources. This can occur in various scenarios, such as when trying to execute a transaction that requires these valuation variants.
Cause: Missing Valuation Variants: The valuation variants for the specified CO resources have not been defined in the system. Incorrect Configuration: The configuration settings for the controlling area or the valuation variant may be incorrect or incomplete. Data Inconsistency: There may be inconsistencies in the master data or configuration that prevent the system from recognizing the valuation variants. Authorization Issues: The user may not have the necessary authorizations to access the valuation variants.
Solution: Define Valuation Variants: Go to the SAP Easy Access screen and navigate to the configuration for CO. Use the transaction code OKTZ to define the valuation variants. Ensure that the valuation
Get instant SAP help. Sign up for our Free Essentials Plan.
KT349
Assignment to activity types only poss. with active CCtr Accounting
What causes this issue? You have selected the indicator <DS:DE.ACTPA>"AA: Activity type"</>. This is only possible if Cost Cent...
KT348
Target version &1 is already being used
What causes this issue? The receiver plan version in Profitability Analysis &V1& is already used in the sender version &V2& (controll...
KT351
Entries for object &1 included in task &2
What causes this issue? The entries were included in task &V2& for order &V3&. In the task editor you can find the entries under the ...
KT352
Activate the business processes in controlling area &1
What causes this issue? You want to define version &V2& in controlling area &V1& as a delta version for strategic Activity-Based Cost...
Click on this link to search all SAP messages.