Message type: E = Error
Message class: KT - RK Message Table Maintenance
Message number: 348
Message text: Target version &1 is already being used
The receiver plan version in Profitability Analysis &V1& is already
used in the sender version &V2& (controlling area &V3&, fiscal year
&V4&). You may assign a receiver version only once to a sender version
for each controlling area and fiscal year.
You have the following options:
Do without the selected assignment.
Remove the assignment &V3&/&V4&/&V2& - &V1&. You can then make the
assignment you require.
Make a different assignment.
Error message extract from SAP system. Copyright SAP SE.
KT348
- Target version &1 is already being used ?The SAP error message KT348, which states "Target version &1 is already being used," typically occurs in the context of SAP Controlling (CO) when you are trying to create or modify a version in the system that is already in use. This can happen in various scenarios, such as when you are trying to create a new planning version or when you are attempting to change an existing version that is currently being utilized in a planning run or other processes.
Cause:
- Version Already in Use: The target version you are trying to create or modify is already being used in some planning activities or transactions.
- Locked Version: The version may be locked due to ongoing processes or user sessions that are currently utilizing that version.
- Configuration Issues: There may be configuration settings that prevent changes to certain versions if they are already in use.
Solution:
- Check Usage: Verify if the target version is currently being used in any planning runs or transactions. You can do this by checking the relevant planning tables or transaction logs.
- Unlock the Version: If the version is locked, you may need to wait for the current processes to complete or manually unlock the version if you have the necessary permissions.
- Create a New Version: If you need to proceed with your planning activities, consider creating a new version instead of modifying the existing one.
- Consult Documentation: Review SAP documentation or help resources for specific instructions related to your version of SAP and the context in which you are encountering this error.
- Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with SAP support for further assistance.
Related Information:
By following these steps, you should be able to address the KT348 error and continue with your planning activities in SAP.
Get instant SAP help. Sign up for our Free Essentials Plan.
KT347
Currency and valuation profile &1 does not contain only cur. type 10
What causes this issue? The currency and valuation profile &V1& is assigned to the controlling area, and the controlling area has currency ty...
KT346
Background job still running - data can be displayed only
What causes this issue? You want to process versions. Currently, this is <ZH>not</> possible because background processing runs for vers...
KT349
Assignment to activity types only poss. with active CCtr Accounting
What causes this issue? You have selected the indicator <DS:DE.ACTPA>"AA: Activity type"</>. This is only possible if Cost Cent...
KT350
Valuation variants &1 &2 for CO resources do not yet exist
What causes this issue? The valuation variants &V1& &V2& for CO resources do not yet exist.System Response Valuation variants &V...