How To Fix KP763 - Template &1 is ignored for &2; No activity types planned in &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KP - CO-OM Planning

  • Message number: 763

  • Message text: Template &1 is ignored for &2; No activity types planned in &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KP763 - Template &1 is ignored for &2; No activity types planned in &3 ?

    The SAP error message KP763 indicates that a template (in this case, &1) is being ignored for a specific cost center or internal order (indicated by &2) because there are no activity types planned in the specified planning version (indicated by &3). This error typically occurs in the context of cost planning or activity-based costing in SAP.

    Cause:

    1. No Activity Types Defined: The primary cause of this error is that there are no activity types assigned to the cost center or internal order for the specified planning version. Activity types are essential for allocating costs to cost objects.
    2. Incorrect Planning Version: The planning version specified may not have any activity types planned, or it may not be the correct version for the intended planning.
    3. Template Configuration: The template being used may not be configured correctly to include the necessary activity types.

    Solution:

    1. Check Activity Types:

      • Go to the relevant cost center or internal order in the SAP system.
      • Verify if any activity types are assigned to it. If not, you will need to define and assign the necessary activity types.
    2. Review Planning Version:

      • Ensure that you are using the correct planning version. You can check the planning version settings in the configuration.
      • If the planning version is incorrect, switch to the appropriate version that contains the required activity types.
    3. Update Template:

      • If the template is not configured correctly, you may need to update it to include the necessary activity types.
      • Check the template settings in the SAP system and ensure that it is set up to include the relevant activity types for the cost center or internal order.
    4. Consult Documentation:

      • Review SAP documentation or help resources related to cost planning and activity types to ensure that you are following the correct procedures.
    5. Testing:

      • After making the necessary changes, re-run the planning process to see if the error persists.

    Related Information:

    • Transaction Codes: You may use transaction codes like KP06 (Cost Center Planning) or KP26 (Activity Type Planning) to manage and review planning data.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • User Roles: Ensure that you have the necessary authorizations to make changes to cost center or internal order planning.

    By following these steps, you should be able to resolve the KP763 error and successfully plan costs using the specified template.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker